Bridges and Tunnels Infrastructure and construction

New Zealand Progressing Tender

📄 Tender ID: 456868135 📅 Published: 28 Sep 2020

📋 Tender Overview

Waka Kotahi NZ Transport Agency says the design and fabrication of the permanent strut for the Auckland Harbour Bridge is now well advanced.The Grade 350 L15 steel for the strut has been sourced and manufactured by NZ Steel and delivered to fabricators in Whangarei. It will be transported to Auckland by truck.The strut will replace the one damaged when 127 kph winds blew a truck into the bridge superstructure last Friday. The temporary repair has not restored the struts load-bearing function but when the new strut is installed it will return the bridge to its full load capacity. Two of the bridges eight lanes will remain closed until its installed.Teams are working at pace to design and peer review the replacement part for the permanent solution and to manufacture and plan for installing it says Waka Kotahi General Manager Transport Services Brett Gliddon.Fabricating the 22.7 metre strut and getting it into position is the quicker part of the process. It will take several weeks before it is tensioned up as a load-bearing part of the bridge superstructure.The bulk of this time is in the design calculation and external peer review of the new strut in relation to how it will impact on the performance of the whole bridge. This includes careful calculations on how to re-balance its load-bearing function.Installation of the new strut will require closure of the southbound lanes of the bridge and this installation will take longer than the temporary fix.On Tuesday night the team only had to remove the damaged part of the strut install the temporary section and bolt it to the bridge deck. This time theyll have to remove the temporary section and the old section connected to the top of the bridge and then install the new permanent strut. That will take much longer.A date for the installation is still not known.As well as the safety and performance of the strut Waka Kotahi is also paying careful attention to how the new piece will look on the bridge which is an iconic piece of Aucklands infrastructure.The materials of the new strut will not exactly match those that were installed 61 years ago. For example it will have welds where the old strut had rivets.Waka Kotahi is working with a consultant conservation architect to ensure the new strut fits appropriately with the landmark status and heritage values of the bridge.The aim is that once its installed and had a coat of paint it will blend in with the rest of the bridge superstructure and the subtle differences will go unnoticed says Brett Gliddon.The steel being used in the permanent fix of the Auckland Harbour Bridge was manufactured right here in New Zealand. Its being fabricated here too by Culham Engineering in Whangarei. Managing Director Rob Kirwan shows us the materials and explains what the process will entail.

🔍 Key Information

📄
Tender Reference No.
456868135
📅
Publication Date
28 Sep 2020
🌐
Sector
Bridges and Tunnels
📝
Notice Type
News
📍
Location
New zealand

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 28 Sep 2020
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country New zealand
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…