📋 Tender Overview
The new section of the Radschnellweg 14 connects Eislingen and Sussen. The cycling fast path is a successful example of how former car traffic areas can be converted sensibly for modern and climate -friendly mobility. A further section of the Eislingen/Fils with the east of Sussen. The bike fast path runs on the route of the former federal road (b) 10, which was dismantled in the course of the new building of todays B 10 between Goppingen and went. From old, B 10 dismantling creates space for bike fast path The dismantling of the B 10Ald to the state road (l) 1214Neu was already planned in 1997, but could not be implemented as planned-changed requirements and framework conditions made adjustments necessary. This has integrated the planning of the RS 14 cycle path into the dismantling planning. Existing intersections were also redesigned: two new roundabouts were built in Salach, and in Sussen the Tobel crossing is currently being converted into a roundabout. The deputy department head Hermann Klyeisen (in the representation of government president Susanne Bay), the ministerial director of the Ministry of Transport and the Mayor Marc Kersting from Sussen and Dennis Eberle from Salach came to the ceremonial opening of the new section. Together they inaugurated the route with a symbolic opening trip. Modern and climate -friendly mobility ministerial director Friess emphasized: The dismantling of the B 10Ald to the new L 1214 is a successful example of how we can adapt traffic areas to changed requirements. With the new section of the RS 14, we show how former car traffic areas can be converted sensibly for modern and climate -friendly mobility. Where cars used to drive on the B 10 - Sure, continuous and quickly. The deputy head of the department Klyeisen said: As a bundle authority, the regional council is significantly involved in the expansion of the B 10 and the planning, construction and promotion of the bicycle traffic infrastructure. With the dismantling of the B 10ALT, we not only complete an important infrastructure project, but at the same time create an important gap closure towards the - a strong sign for modern and sustainable mobility in the filstal. Cycling quick connection Filstal The Filstal cycle connection (Ebersbach-Goppingen-Sussen) should build on the RS 4 (Stuttgart-Reichenbach) and lead to Sussen via Ebersbach, Uhingen, Goppingen and Salach. Planning section A leads from the Goppingen district border (connection to the demo piece) to the Fils crossing in Ebersbach (800 meters) and was released for bicycle traffic a few weeks ago. The planning section B leads from the Fils crossing near Ebersbach to the roundabout point Ulmer Str. (L 1214) in Eislingen/Fils. This section is in a municipal construction load and is planned by the district of Goppingen. The route from Eislingen/Fils to Sussen Ost, which is released today, represents the planning section C. The dismantling of the B 10ALT/L 1214NEU is part of the planning approval decision of May 30, 1997 for the new construction of the B 10 between Goppingen and Fahn, the B 466 local bypass (OU) Sussen and the district road (K) 1404 Querspange Eislingen. As a compensation measure, the B 10ALT/L 1214NEU was dismantled over a length of almost 3.1 kilometers between Eislingen and Sussen from four to two lanes. As a result, an area of around 25,000 square meters was sealed. Land is investing 7.5 million euros With the construction work, the barrier -free conversion of eight bus stops, the renovation of two bridge structures, the demolition of a pedestrian underpass, the production of three circular reversals and the construction of a new cycle path (RS 14). The construction work was also used by the management providers for extensive line renewal. The start of construction of the total measure was on March 4, 2024. In order to keep the impairments for road users as low as possible, the construction work was divided into eight construction phases and could therefore be completed in sections. The federal government is investing around 7.5 million euros in this project. The country as well as the city of Sussen and the municipality of Salach are investing around 1.3 million euros.