📋 Tender Overview
Yuriko Backes, Minister of Mobility and Public Works, inaugurated the roundabout in Reichlange on March 25, 2026, as a redevelopment of the crossroads aimed at improving mobility in the north of the country, in the presence of Henri Gerekens, mayor of the municipality of Redange/Attert. Gallery 1 Inauguration - Group photo (c) MMTP Passerelle (c) MMTP Rond-point Reichlange (c) MMTP Rond-point Reichlange (c) MMTP Given the strategic importance of the crossroads made up exclusively of national roads (N12, N22 and N23) and its identification as a risk zone due to the inherent danger of the intersections, it proved essential to initiate the construction of a new road development. As a result, this development aims to eliminate the risk factors observed and improve road safety and traffic flow. The inauguration of the roundabout, the rehabilitation of the bridge as well as the construction of the new footbridge mark an important step for more fluid mobility and enhanced safety of travel within the municipality and the entire region. This set of developments demonstrates our joint desire, State and municipality, to promote regional cycling and improve local road traffic to offer the population and users modern infrastructure designed for their daily well-being, said Yuriko Backes, Minister of Transport. Mobility and Public Works. A project carried out in stages to guarantee continuous and safe traffic. Started on April 2, 2024, the work was carried out thanks to precise planning and execution in stages, thus ensuring that traffic flow was maintained. They focused on the complete construction of the new roundabout, including sidewalks, parking lots, the renewal of public lighting as well as the modernization of the mixed water, rainwater and electrical networks. The weather station used for winter management was also moved. The cycle-pedestrian facilities and bus stops were built in accordance with accessibility requirements. The Diekirch roads division of the Roads and Bridges Administration was responsible for the design of the project and the coordination of the site. After the road works, the Nature and Forestry Administration installed a swallow tower and the municipality of Redange/Attert carried out landscaping and the installation of an illuminated sculpture in the center of the roundabout. A new key gateway for municipal and regional cycling In parallel with the construction of the roundabout, the OA318 bridge was rehabilitated, supplemented by a new gateway offering a secure, direct and comfortable cycle route. This dedicated infrastructure is fully part of the development of the municipal, regional and national network to strengthen cycling. The new cycle bridge is a major asset for active travel: it offers a separate crossing from road traffic, generous space for cyclists and a more friendly and peaceful experience. Its installation creates an essential link between existing routes and helps encourage daily use of bicycles.