📋 Tender Overview
The road infrastructure work Improvement of the urban mobility service on Av. Rinconada, extension Av. Loreto, located in the La Rinconada urbanization, with a budget of more than 6 million 194 thousand soles, has to date registered 96% physical progress and will soon be put at the service of the population.
The Infrastructure Manager, Eng. Wilder Bazan Maldonado, carried out a technical inspection to verify the progress of the works, which include the construction of rigid pavement, curbs, gutters, storm drainage system, traffic signs and green areas.
This important work will allow for decongesting the city center and strengthening road connectivity, articulating with the road that links the city of Juliaca with the routes to Puno and Arequipa, thus contributing to more efficient and safer mobility for citizens.