📋 Tender Overview
11.07.2025 A new information system for passengers at 17 stations between Warsaw and Radomiemod today new displays with the timetable at the Warka station, the Warka Miasto stop and sound system at 17 stops and stations between Warsaw and Radom. Passengers gained a convenient system of information about train departures. The investment worth PLN 12 million net was implemented from the funds of the National Plan of Reconstruction and Increased immunity. We installed devices of the central dynamic passenger information system (CSDiP) in 17 places. These are 3 stations: Chynow, Warka, Dobieszyn and 14 stops: Sulkowice, Krezel, Michalczew, Gosniewice, Warka Miasto, Grabow nad Pilica, Strzyzyna, Kruszyna, Wola Bierwiecka, Bartodzieje, Lesiow, Radom Stara Wola, Radom North Radom, and Radom Golebiow. In all these locations, we adapted the existing sound system to the modern system. At the Warka station, in the passage, at the entrances and on the platforms, we installed 27 displays with information about the nearest trains. 4 displays were installed at the Warka City stop. New devices provide current information in a clear and understandable way, which significantly improves the comfort of travel. The displays present information about the arrival and departure of trains in real time, taking into account any delays thanks to installed train sensors that inform SDIP devices on an ongoing basis about the departure of the train from the preceding station. The contractor of the task was Maxto Technology Sp. z o.o. The works did not affect the train movement.