Weather influences can be a challenge for train detection on the Havenspoorlijn. This year ProRail and engineering firm Sweco are testing the performance of the detection system with axle counters on the outer contour in the Port area. If this proves to be more resistant to sand and salt in all seasons the current system will be replaced. This should reduce the number of disruptions.Track occupationIs a track section occupied or not This is still being determined with the Jade detection system with track currents. Because parts of the system are approaching the end of their service life and there is a lot of nuisance on the outer contour due to sand and salt a pilot is now being conducted to test how the detection system with axle counters functions.The pilot is set up on the outer contour of the Maasvlakte where sand and wind have free rein and will last for a year. This pilot is the first large-scale project with GAST-NL axle counters within the goods process in the Netherlands.shadow companyRail freight transport will continue as normal during the pilot so the axle counters are located on the same route as the Jade track current loops with which the track is now protected. This provides even more measurement data because the behavior of both systems in the same situation can be compared.Engineering firm Sweco analyzes the pilot results and maps out all possible scenarios for the functioning of the axle counters. Good use is made of digital possibilities to monitor the area of more than 50 km. With 360 photos the entire area has been mapped in detail with GPS location.The techniqueThe system of track currents functions by built-in electrical circuits in the rails which are short-circuited when the wheels of the train pass. Thus a shorted track current loop indicates that a track section is occupied. An axle counter at the beginning and at the end of the track section counts the axles so the system determines whether the section is free or occupied.Daily operationIn addition to detection and weather influences ProRail and Sweco also look at the design regulations and the operating instructions in particular the process of fault repair and maintenance and what this means for the daily operation. The first results of the pilot are expected in the autumn.
🔍 Key Information
📄
Tender Reference No.
473673575
📅
Publication Date
30 May 2022
🌐
Sector
Energy, Power and Electrical
📝
Notice Type
News
📍
Location
Netherlands
📁
Documents & Downloads
No documents found
🏷️ CPV
No CPV found
Need help with this bid?
Our bid experts can help you find, evaluate & win more tenders.