📋 Tender Overview
The entrance to Dordrecht station on the side of the Weizigtpark will look very different. ProRail is building a completely new entrance to the station combined with a new bicycle shed. There is room for more than 2000 bicycles which is almost three times as many as now.FirstIt will be ProRails first circular bicycle parking a beautiful project financed by the municipality of Dordrecht the province of Zuid-Holland and the Ministry of Infrastructure and Water Management and in collaboration with NS. The tender has been completed contractor Hegeman will carry out the construction work.Lively and comfortableThe number of train passengers is growing and more and more people are coming to Dordrecht station by bike via the Weizigtpark. The current bicycle shed is too small looks messy due to wildly parked bicycles and feels unsafe in the dark. Helga Cuijpers regional director Randstad Zuid is pleased There will be a bicycle shed and station entrance with an inviting appearance. In connection with the renewal of the Weizigtpark by the municipality the station area will come to life more and become more accessible.In addition the new bicycle parking facility is an example of ProRails circular ambitions. Helga For ProRail this is the first demountable bicycle shed. The building parts can be moved or reused for other applications in the future. In addition there will be solar cells and solar panels on the roof that generate energy for the station.An open bicycle pavilionThe design is by architects Iris van Huijstee and Paul van der Ree of studioSK. Engineering firm Movares worked out the design. Paul The architecture of an airy open bicycle pavilion fits perfectly at this location in the park. The pavilion exudes a warm welcome. The glass roof provides daylight and generates energy at the same time. The expressive wooden rafters reinforce the direction from the park to the trains and vice versa. In addition the use of the wooden building components stores CO2 which therefore does not enter the environment.Planning and disruptionIn the coming months the preparatory work will be done such as drawing up a detailed implementation draft. The construction of the new station entrance and bicycle shed is expected to start this summer. During the works the station will remain accessible and trains will run according to the timetable. We keep the environment informed when work is being done. If everything goes according to plan the work will be completed in early 2024. Then an important and first step has been taken in the total area development that the municipality of Dordrecht has in mind for the Spoorzone.Bicycle parking at stationsSince the year 2000 ProRail has modernized almost all bicycle parking spaces in the Netherlands at more than 400 stations. Municipalities and NS are an important financing and cooperation party in this respect. In this way together we increase sustainable public transport mobility to and from the station and keep the city and stations sustainably accessible. The total number of parking spaces at stations is now more than 500000. Depending on available co-financing this number will grow considerably in the coming years to approximately 700000 bicycle parking spaces in 2040.