📋 Tender Overview
The preparatory work at Esch started on Thursday morning 23 March. There badgers have undermined the railways and the safety of train traffic can no longer be guaranteed. As a result train traffic between Den Bosch and Boxtel has been at a standstill since 2113 on 00 March.Check valvesFrom 0700 this morning mowing of the embankment on the eastern track has started. By partially removing the vegetation here we make the place less attractive for the badger. After mowing we place check valves at the end of the corridors of the badger. In this way the badgers can safely leave their castle but cannot return. We do this under the guidance of ecologists and the Netherlands Enterprise Agency RVO is also present. The first valve has now been installed.Until sunsetWe will continue with these preparations until sunset. This gives the badger the opportunity to leave the castle at night. As soon as we have received an exemption we will then start the actual work as soon as possible and we can restore the ground under the track. We do this by digging out the embankment until we come across the castles. When we have dug out enough and all the badgers have left or moved we fill in the holes and corridors and restore the subsoil.At the same time we are still investigating the ground on the western track. We use radar to investigate where the castles are located so that we also know where we need to work. Subsequently the track is also repaired in the same way on that side.Check a trip plannerThe coming period will be dominated by urgent consultations with competent authorities and experts. It is therefore not yet clear when the recovery will take place and when trains will be able to run again between Den Bosch and Boxtel. We advise you to consult a travel planner before departure.