📋 Tender Overview
In a silage wheel bench which is basically a lathe placed in a pit train wheels are maintained. The current silage wheel bank in Leidschendam is outdated and needs to be replaced. The rail infrastructure at the yard is also being overhauled.A sustainable partnershipPart of the tracks on the site belong to NS part to ProRail. In order to keep the process clear and workable with the increase in the number of trains we adjust the track layout. According to Rob Luyten director of technology at NS this project is a good example of the collaboration between ProRail and NS.ProRail wants to renew the rail infrastructure on the yard and NS wants to build a new silage wheel bank building. In order to run the trains to the new silage wheel bank a new bridge over the water the Goo will even have to be built. That is why we have joined forces and brought the various projects together. Thats efficient and sustainable.Reuse of materialsSustainability is an important theme for both ProRail and NS says Jan Mulder deputy director of projects at ProRail. We both play an important role in sustainable rail transport. We also want to work as sustainably as possible in construction projects. We go for circular and sustainable construction with as much reuse of materials as possible. The latter reduces CO2 emissions and increases security of supply. Around 1100 windows from old trains will be installed in the faade of the new NS building. We test the effect of moisture and dirt on the windows and rubber to determine how much maintenance is needed. The building will have solar panels and heat pumps. The roof is covered with sedum. This succulent plant retains moisture so the building stays cool in the summer.Decommissioning testedDuring the work however it is important that the maintenance staff can continue to carry out their work. Jos Dittmar project manager of NS In order to properly connect the rail infrastructure of the yard to the main rail network there will be a decommissioning from 23 November to 13 December. Thats quite a long period. The main rail network on site and the local rail network of the maintenance company are then completely switched off except for the infrastructure in the production hall that is necessary for the maintenance of the equipment. In order to be well prepared for this a try-out was held on the night of 25 to 26 May.Sustainability is an important theme for both ProRail and NS.Accessibility maintenance companyJudith Berben implementation manager at NS The aim of this exercise was to investigate whether the maintenance company is easily accessible during the decommissioning this autumn. The store must remain open during the decommissioning so that there is no shortage of equipment. For transporting equipment to and from the maintenance company we cannot use high voltage during this period. After the try-out it is now clear that the maintenance company can remain open without high voltage. ProRail VolkerRail Arcadis and several NS departments were involved in the try-out. The involvement of these parties was excellent.Jos The project is going according to plan. The construction of the artwork over the Goo has now been completed. This literally bridges the gap between the Centrally Operated Area and the new silage wheel bank tracks have been built. After this the area is free for the next phase of the project the construction of the new infrastructure and the construction of the silage wheel bank building. Contractor KDekker is now working the building and the execution design. The contour of the pit is already clearly recognizable.