📋 Tender Overview
The Final Design containing the new interior for Annas Hoeve and Monnikenberg in Hilversum is ready.The area around the fauna tunnel and the nature bridge will be redesigned to enhance nature and improve facilities for recreational users. The adaptations also ensure that animals can safely cross the new road at Annas Hoeve the new HOV bus lane in t Gooi and the railway via the newly constructed nature bridge. Work will start this fall.By connecting nature reserves in t Gooi and on the Utrechtse Heuvelrug the so-called Green Link is created a large diverse and contiguous nature reserve. For this purpose a wildlife tunnel was previously constructed under the A27 and a nature bridge over the Hilversum-Amersfoort railway is under construction. By strengthening the nature and recreational facilities at Annas Hoeve and Monnikenberg. the Green Link is completed.Room for nature and recreation The new layout consists of varied nature such as heather forest sandy open spaces pools and nature-friendly banks. By constructing new footpaths through the area and redesigning the play pond the recreational possibilities of Annas Hoeve and Monnikenberg will also strengthen. Part of the new footpaths consists of platforms. In Annas Hoeve the familiar circle around the mountain pond is preserved. In Monnikenberg the platforms make it possible to fully enjoy the new heathland. The Berg van Dudok will be given a new staircase on both sides and the vantage point on top of the mountain will be renovated. Now that the design is ready the province will start preparing for the implementation which is expected to start this autumn.