📋 Tender Overview
In November contractor van Steenwijk carried out work on the Strawberry Bridge at night. Material damage occurred during this work. The plan is for the entire superstructure to be dismantled and removed for repair in the evening of 20 January 2021.After the damage to the bridge an investigation was carried out together with the insurance company on how and whether the damage can be repaired. It has been decided to partially renew the balance sheet in the contractors workshop. The collision damage to the hamei is also repaired there.Dismantling is done with a crane on a pontoon in the Aardbeiensloot. To minimize nuisance for residents the work will be carried out between 9 p.m. and midnight. During these works the bridge is only accessible to pedestrians and cyclists. The contractor has a shuttle bus available again. Emergency and emergency services can visit them in the event of a calamity.Wood for such large beams is often not in stock. The contractor aims to replace the partially renovated and repaired superstructure by the end of March 2021. This too is accompanied by a nightly closure.