📋 Tender Overview
On Wednesday evening August 12 one of three railway bridges near Gouda did not want to close properly. Mechanics urgently worked on a solution. The bridge was put back into service at 11 p.m.Update 11.30pmThe railway bridge is back in service and trains are running again. A defective part has been replaced.Limited train traffic The bridge is located together with two other side bridges on the west side of Gouda station. The other two are also ridden normally today. The disturbed bridge hindered train traffic for Utrecht-Rotterdam and Utrecht-The Hague.Specialist personnelThe blockage started around 6 p.m. possibly caused by the extreme weather of the last days. Mechanics were quickly on the spot. Multiple attempts to close the bridge did not lead to a solution. A printed circuit board turned out to be defective and was replaced.