📋 Tender Overview
The cause of the malfunction in the traffic control station of ProRail in Amsterdam has been found. It concerns a defective hardware component in the system for operating signals and switches. This hardware component has since been replaced. The system has been extensively tested over the past two days and is working again.
Back to Amsterdam
Now that the malfunction has been resolved, we will return to the traffic control post in Amsterdam on Friday and Saturday night. Until then, we will work from the fallback location in Utrecht. During the return, no trains can run in the Amsterdam region. This has an impact on passengers and carriers.
CEO of ProRail John Voppen: "Passengers and carriers were bothered from Sunday to Monday morning: train traffic near Amsterdam was cancelled. We don't want that and it hasn't happened in the days since. Extra deployment and the switch to a fallback location offered a temporary solution. The defect itself has now been sorted out and that is good news: we can go back to normal."
We can go back to normal.
John Voppen, CEO at ProRail Move to Utrecht
Since Sunday 4 June, there has been a major malfunction in the Amsterdam traffic control post, which made it necessary to divert to Utrecht. The train traffic in Amsterdam and surroundings is still served from the fallback location in Utrecht. Train traffic is currently not affected by this. This gives us the opportunity to first carry out extensive tests on the system in Amsterdam.
You can return to the traffic control post in Amsterdam in the night from Friday to Saturday (June 10). During this relocation, the systems in Amsterdam are activated and the staff is also brought from Utrecht to Amsterdam. Because the systems are out of the air, no train traffic is possible around Amsterdam. This is done at night, in order to keep the inconvenience to train traffic as limited as possible. We are doing everything we can to have everything ready when the first trains start running again on Saturday.
Impact on passengers and freight transport
As a result of the move, it is not possible to run trains in the Amsterdam region from Friday to Saturday night from midnight until early Saturday morning. No freight transport is possible either. NS is investigating other possibilities, but the first picture is that there will be very limited them.
NS therefore advises passengers to arrange alternative transport or not to travel in the Amsterdam region. ProRail and NS emphasize that it is extremely annoying for passengers who have to deal with this. Passengers are kept informed as much as possible via the NS journey planner and website.
Hardware failure
In recent days, research has been done to determine the cause. The analysis shows that a certain hardware component was malfunctioning. As a result, the software that controls the operation of signals and switches fails. We are conducting further research into how we can prevent this from happening in the future.
The system for operating signals and switches at the traffic control station in Amsterdam is fully redundant. This means that a defective part basically has a backup, which it takes over in the event of malfunction or defect. However, during the failure, the hardware component in question did not signal that something was wrong. As a result, the redundancy also did not function correctly.