📋 Tender Overview
Coming weekend 28 and 29 September platform two from Bunde station will be redesigned to renew the platform tiles and retaining walls. What is special is that the new platform tiles are 76 circular. For this ProRail has had the old tiles from Anna Paulowna station fully recycled.Just a little bit of new cementProRail has partnered with Studio Wae for this special project. This start-up from Utrecht has succeeded in developing tiles that consist of 76 circular concrete. This means that the concrete consists of 76 recycled material in this case the old platform tiles from Anna Paulowna station that are 100 reused. To make new tiles from them they have been cleverly ground so that the original elements such as sand water gravel and cement could be reused. To achieve the correct strength only some new cement has been added.Retaining wallsContractor Vest Infracommissioned by ProRail will not only replace the platform tiles but also the retaining walls. These were produced by Strukton in collaboration with GBN and also consist of recycled concrete to which only cement has been added. Moreover they are designed in such a way that they can be easily adjusted in height after placement. This is occasionally necessary to continue to guarantee a level-entry entry. In the old situation we should have had the entire platform excavated to reset the retaining wall. Thanks to a smart design that is no longer necessary and that saves considerably in energy consumption and CO2 emissions.Concrete agreementIn 2018 ProRail put its signature under the concrete agreement. Based on this agreement ProRail is making efforts to reduce the CO2 emissions of concrete by 49 in 2030. We want to achieve this through the application of innovative techniques. We do not do this alone but together with other parties such as transporters governments suppliers contractors and engineering firms so that we can realize such special projects as in Bunde. In the Sustainable Rail brochure read more about the long-term policy up to 2030 and about cooperation with other parties. Consequences of train trafficDue to this and other work no trains will run between Sittard and Maastricht this weekend. NS and Arriva use stop and express buses for travelers.