📋 Tender Overview
Vietnam Road Administration recommends continuing to allocate resources to upgrade and expand National Highway 1 and key national highways with high traffic. At the same time, perfect traffic organization and early and remote channel separation using a smart traffic system, reducing the load on current overloaded routes. Download National Highway 1 bypassing Ha Tinh City (old) is a 2-way, 2-lane road with no median strip, leading to traffic insecurity - Photo: Ha Tinh Newspaper The Vietnam Road Administration (Ministry of Construction) has just reported on the implementation of solutions to strengthen and improve traffic infrastructure safety on National Highway 1 (NH1) and key national highways. In particular, priority is given to handling black spots and potential traffic accident spots arising during the exploitation process. National Highway 1 is the countrys lifeline with a length of more than 2,300km. In recent years, this route has been upgraded and expanded in many ways, contributing to improving traffic capacity and reducing traffic pressure. In addition to National Highway 1, routes with large traffic volumes such as National Highway 3, National Highway 5, National Highway 6 have also been invested in many projects to handle black spots, potential traffic accident spots and overcome inadequacies in traffic organization. From 2022 up to now, road sector units have handled more than 368 accident black spots. In the context of increased vehicle traffic on National Highway 1, the Vietnam Road Department has deployed the application of intelligent traffic systems (ITS) and artificial intelligence (AI) to improve the capacity to manage, monitor and ensure traffic safety on national highways. National highways such as National Highway 6, National Highway 3, National Highway 4A, National Highway 4C and Ho Chi Minh Highway have complex terrain, many steep passes, small curve radius, and limited visibility. Meanwhile, vehicle traffic, especially large trucks and long-distance passenger cars, tends to increase, posing many potential traffic safety risks. These routes are currently being applied many maintenance solutions and synchronous traffic organization, suitable to the conditions of each region. Download Vehicle waiting on National Highway 1 through the section of Dak Lak province for 2 days unable to move because of the historic flood in November 2025 - Photo: Thanh Nien NewspaperIncreasing capital for maintenance and expansion of National Highway 1 However, vehicle traffic on National Highway 1 and key national highways is increasing rapidly, the traffic situation is still complicated, even though the Ministry of Construction and localities have invested in construction systems and road signs. Ministry. Funding resources for the management, maintenance and handling of black spots and potential traffic accident spots are limited, leading to the handling having to be carried out according to annual roadmaps and plans. In addition, some BOT investors managing sections of National Highway 1 are still slow to overcome black spots and potential traffic accident spots, affecting the effectiveness of ensuring traffic safety. From the above reality, the Vietnam Road Administration recommends continuing to allocate resources to upgrade and expand National Highway 1 and key national highways with high traffic. At the same time, research to perfect traffic organization and channelization early and from afar; Effectively promote the smart traffic system to reduce the load on overloaded routes, with potential risks of traffic accidents. This agency also proposed to increase funding for management and maintenance; Prioritize handling black spots and potential traffic accident spots, especially in mountainous and remote areas; At the same time, study the mechanism for mobilizing socialized resources. Localities need to continue to coordinate closely in site clearance work, especially for locations related to forest land; Research to simplify procedures and shorten the time to change land use purposes to speed up the progress of projects to handle black spots and potential accident spots. Vietnam Road Administration also recommends that the Ministry of Construction consult with the Ministry of Justice, the Ministry of Agriculture and Environment and localities to remove obstacles in site clearance, especially related to forest land; At the same time, simplifying procedures to promote the implementation of projects. Proposed nearly 11,000 billion to expand National Highway 1 to 4 lanes. Previously, in March 2026, the Northern Road Project Management Board submitted to the Vietnam Road Administration for appraisal of the pre-feasibility study report of the project to upgrade and expand a number of route sections on National Highway 1, passing through provinces from Quang Tri to Vinh Long. The project is expected to be implemented in the period 2025-2030. According to this unit, many sections of National Highway 1 through provinces such as Quang Tri, Hue, Da Nang, Quang Ngai, Gia Lai, Dak Lak, Khanh Hoa, Vinh Long, Tay Ninh, and Dong Thap currently only have 2 lanes, put into operation from 1998 - 2015. Up to now, these sections have been overloaded due to Vehicle traffic is increasing rapidly, while urbanization and industrialization are taking place strongly, causing road surface deterioration and damage. Not only that, the lack of synchronization with sections of National Highway 1 that have been expanded to 4 lanes in the area also causes local congestion, prolongs traffic time and poses a potential risk of traffic insecurity, affecting transportation and the investment environment. Therefore, upgrading and expanding sections on National Highway 1 is necessary and urgent. According to the proposal, the project will expand from 2 lanes to 4 motor vehicle lanes, adding 2 rudimentary vehicle lanes and a median strip; roadbed widthg about 20.5m. Total preliminary investment is about 10,813 billion VND