Energy, Power and Electrical

Nationwide Query Future Tender

📄 Tender ID: 529917545 📅 Published: 07 Mar 2026

📋 Tender Overview

As a planning basis for the 2027 network development plan, the network operators have launched another joint market survey. An efficient energy infrastructure is the backbone of the External: Energy Transition (Opens in new window). In order to be prepared for the renewable future, network operators must expand energy networks in line with demand. To do this, they need reliable information on how much External: Electricity (Opens in new window) and External: Hydrogen (Opens in new window) industry, businesses and households need and in which locations. Thats why the network operators have launched an External: second joint market survey (Opens in new window). Active participation necessary We need a high level of participation. Only then can the needs for electricity and hydrogen be realistically incorporated into the plans for the external network expansion and conversion (opens in new window) in the state. I therefore ask all market participants, companies, municipal utilities and distribution network operators in Baden-Wurttemberg to take part in the survey, emphasizes Energy Minister Thekla Walker. The transmission system operators (for the electricity infrastructure) and long-distance system operators (for the future hydrogen infrastructure) will carry out a joint survey about future requirements until March 13, 2026. The query is aimed in particular at project developers and operators of large power-to-gas systems and hydrogen power plants as well as other large consumers and connection users in the electricity and hydrogen sector. Expand the energy system to achieve greater energy sovereignty The energy system in Germany is facing a far-reaching restructuring. The importance of this transformation is currently demonstrated by the latest developments in the Middle East and the resulting uncertainty on the global energy markets. We have to achieve more energy sovereignty. We can achieve this with a decisive expansion of external: renewable energies (opens in new window), electrification and the ramp-up of hydrogen, explains Energy Minister Thekla Walker. Hydrogen must be produced locally here in Baden-Wurttemberg. We cannot rely on a timely nationwide hydrogen economy (Opens in new window). The federal government has still not presented a final power plant strategy. Instead, the power plants should run on natural gas (Opens in new window) until 2045 and only then switch to hydrogen. As a result, important hydrogen anchor customers for the hydrogen infrastructure are missing and we are losing valuable ones Time on the way to climate neutrality. Network development plan 2027 According to the External: Energy Industry Act (Opens in new window), network operators are obliged to create needs-based network development plans for External: Electricity (Opens in new window) as well as for External: Gas (Opens in new window) and External: Hydrogen (Opens in new window). They regularly adapt their plans to the necessary infrastructure requirements. So that coordinated, cross-sector planning for the transformation of the energy system can take place, there will be another external: joint query of electricity and hydrogen for the 2027 network development plan (opens in new window).

🔍 Key Information

📄
Tender Reference No.
529917545
📅
Publication Date
07 Mar 2026
🌐
Sector
Energy, Power and Electrical
📝
Notice Type
News
📍
Location
Germany

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 07 Mar 2026
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Germany
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…