Railways

National Railway Line Tender

📄 Tender ID: 526256716 📅 Published: 16 Dec 2025

📋 Tender Overview

Consecutive natural disasters in October-November 2025 have seriously damaged railway infrastructure. In addition to declaring a state of emergency, Vietnam Railway Corporation estimated the total cost to repair infrastructure to be more than 585 billion VND and the damage to rail transport to be nearly 200 billion VND. The Van Canh - Phuoc Lanh area suffered serious landslides when storm No. 13 passed with a length of about 75m and a depth of up to 9m... creating a scene of hanging rails and paralysis of the North-South railway. This afternoon (December 15), the Vietnam Railways Corporation (VNSR) organized a Conference on the Prevention, Prevention and Remediation of Natural Disaster Consequences; incident response and rescue in the railway sector. Information at the conference, Mr. Hoang Gia Khanh, General Director of Vietnam Railway Corporation (VNR) said that in 2025 storms, floods and heavy rains will directly affect and cause heavy damage to railway infrastructure and production and business activities. Many infrastructure locations were damaged, causing congestion on the main line, forcing the Corporation to stop train operations, organize emergency repairs and transfer passengers. Vietnam Railways Corporation (VNR) organizes a Conference on preventing, combating and overcoming the consequences of natural disasters; Incident response and rescue in the railway sector - Photo: VGP/PT Announcing an emergency situation due to serious infrastructure damage At the end of November 2025, storm No. 13 (Kalmaegi) in November 2025 caused serious landslides on the North-South railway line, especially the area from Km1136+850 - Km1136+925, Van Canh - Phuoc Lanh section. The most serious landslide was about 75m long and up to 9m deep... creating a scene of hanging rails and paralyzing train traffic for many days, forcing thousands of passengers to be transported by road, before being repaired and opening the route on November 10, 2025. reopened the national railway line after 4 days of landslides, Mr. Hoang Gia Khanh informed. Yen Bai station and Van Phu station had water flooding the top of the rails, the Yen Bai information tower was flooded over 1 meter, many locations had landslides, soil covered the rail surface... Previously, storm No. 9 (typhoon Ragasa), storm No. 10 (typhoon Bualoi) and storm circulation also caused prolonged heavy rain, Yen Bai stations, Van Phu station had water flooded the top of the rails, Yen Bai information tower was flooded more than 1 meter, many locations were flooded. Positive slope, railway surface fill... On December 5, 2025, the Ministry of Construction issued Decision No. 2242/QD-BXD announcing a natural disaster emergency to repair damage to traffic infrastructure on the Hanoi - Ho Chi Minh City railway. On October 9, in Trung Gia commune, Hanoi city, floodwaters swept away the entire railway foundation, threatening train safety at Km16+700 - Km18+250 on the Dong Anh - Quan Trieu railway. On October 26, the impact of storm No. Xa - Hue. On November 6, storm No. 13 affected provinces from Quang Ngai to Phu Yen (now Dak Lak province), causing many railway lines to be damaged and train operations to be interrupted. Damage of more than 700 billion VND in infrastructure and transportation. Mr. Tran Anh Tuan, Deputy General Director of VNR, said that Vietnam Railways Corporation always attaches importance to the work of building natural disaster prevention plans, making statistics on key points on the national railway network to check, repair and reinforce before the rainy season. Therefore, as soon as incidents occurred due to storms or floods affecting infrastructure and transportation, railway units proactively responded quickly and effectively. Many emergency situations have been handled promptly, minimizing damage to people and property, maintaining smooth basic transport operations, and minimizing impact on passengers. VNR estimates the total cost to repair infrastructure at more than 585 billion VND, of which: Estimated cost for step 1 repair is more than 138 billion VND; The emergency repair budget is expected to be about 447 billion VND. However, due to the impact of the storm and prolonged heavy rains, it has caused heavy damage to the railway infrastructure on the railway lines. Many locations have damaged the entire roadbed, washed away the rock foundation, deformed the upper floor architecture, forcing the blockade of the area to organize rescue....VNR estimates the total cost to repair the infrastructure is more than 585 billion VND, of which: Estimated cost for step 1 repair estimated more than 138 billion VND; Estimated emergency treatment costs are about 447 billion VND. Regarding transportation, the estimated damage is about 186.9 billion VND. In which: Damage due to having to stop running 121 passenger trains, 117 freight trains, transporting 8,454 passengers, transporting goods by road, serving 45,205 free meals, refunding 39,000 train tickets. Loss of transport revenue due to train suspension is 74 billion VND; Damage to locomotives and carriages was 2.12 billion VND. Transport revenue decreased by about 5 billion VND/day due to having to limit train speed through damaged areas, reducing throughput capacity; estimated loss of about 100 billion VND in revenue in about 20 days. Vietnam Railway Corporation recommends that competent authorities prioritize allocating funds to immediately carry out emergency works to preventRepair damage to railway transport infrastructure on the Hanoi - Ho Chi Minh City railway line. Prioritize allocating funds to carry out emergency works. Faced with this situation, Vietnam Railway Corporation recommends that the Ministry of Construction and the Ministry of Finance report to competent authorities to adjust the fee for using railway infrastructure to 2%, applicable for the period 2026-2030 to reduce financial difficulties for businesses, contributing to stabilizing production and business. business, maintain go

🔍 Key Information

📄
Tender Reference No.
526256716
📅
Publication Date
16 Dec 2025
🌐
Sector
Railways
📝
Notice Type
News
📍
Location
Viet nam

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 16 Dec 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Viet nam
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…