📋 Tender Overview
The Ministry of Transport and Communications (MTC), through Nacional Provias, continues with the lighting installation works along the Nanay bridge, a vital infrastructure for the connectivity and safety of the Peruvian Amazon. These are developed in the district of Punchana, province of Maynas, in Loreto, seek to strengthen road safety for the more than 121 thousand inhabitants that benefit from this important route.
The interventions advance significantly with the assembly of posts and the wiring laying. Throughout the structure, a total of 126 Led Led Led Led and High Performance LEDs will be placed in a 2.5 km section. These intelligent lights will be connected to a remote control system that will allow monitoring and managing its operation efficiently. For this purpose, 118 metal posts and 4 concrete have been installed.
The intervention also considers elements of electrical protection and air safety. To protect the structure during thunderstorms, 16 lightning rods connected to a equipment of equipment. Additionally, security beacons will be placed in the towers of the bridge for air safety: 8 low intensity in the middle and 4 dual lighting in the highest part.
The works focus on the installation of a modern lighting and security system. The main objective is to guarantee a safer and more efficient transit for pedestrians and conductors, facilitating the operability of the bridge, especially under conditions of low visibility and during night hours.
The Nanay bridge is a fundamental axis for the integration of Loreto. With this investment, the MTC reaffirms its commitment to a safe and modern national road network that contributes directly to the development and quality of life of the populations of the Amazon.