Infrastructure and construction

More Than Million Tender

📄 Tender ID: 528846019 📅 Published: 13 Feb 2026

📋 Tender Overview

After more than fifty years, Yarapaleno students will have a modern and equipped campus. Educational infrastructure will have a reverse osmosis plant for drinking water and a treatment plant.Una gestion que cumple. Today, in the middle of a landscape of olive trees, the Regional Government of Tacna began the construction of the new headquarters of the I.E. Ndeg 42199 Juan Velasco Alvarado, in the border district of La Yarada Los Palos. This work, awaited for 52 years, will transform education in the jurisdiction.

Amid fanfare and the enthusiasm of the Yarapaleno people, the Regional Governor of Tacna, Luis Torres Robledo, laid the first stone of the project. The infrastructure will be cutting-edge and inclusive, equipped with cutting-edge technology to promote the technical training of hundreds of students.


The regional authority congratulated the tenacious fight of the parents and former directors: I congratulate each one of you for achieving the beginning of this work that will move this population forward; your children will be educated in better conditions than we had, he highlighted.


Likewise, he highlighted the execution of the Tacna - Boca del Rio double road (MTC road) and the future GORE Tacna projects for the district, such as the Malecon de Los Palos and Av. Los Naranjales.


The project Improvement of the educational service at the primary and secondary level of the I.E. 42199 Juan Velasco Alvarado, district of La Yarada Los Palos - province of Tacna - department of Tacna, will require an investment of S/57,813,461.35. It will be executed through the modality of Works for Taxes by the Educational Financial Consortium, ensuring its completion within the established period of 450 calendar days.


The construction resident, Eng. Oscar Licota, announced that 0 kilometer machinery will be used and its own concrete plant will be installed to optimize times. In addition, the BIM methodology will be implemented to guarantee transparency in execution. The building will also have a reverse osmosis plant for drinking water and a wastewater treatment plant.

The work will consist of seven blocks that will house 12 primary and 10 secondary classrooms, innovation classrooms, connectivity modules, administrative environments and libraries. It will also have a Multipurpose Room (SUM), topic, kitchen and dining room. Outside, the olive tree growing areas, sports slab, soccer field, athletic track, gymnastics area and a patio with raschell mesh coverage stand out.

The project includes a specialized workshop for the extraction of olive oil and derivatives, equipped with raw material reception, fermentation, packaging and quality control areas. Finally, modern robotics, audiovisual production, research and design laboratories will be implemented, equipped with state-of-the-art furniture and technology with a projected useful life of 10 years.

The director of the campus, Lic. Eugenia Chipana Alave, maintained that they currently operate on just half a hectare with precarious environments and eternit roofs. The new work will move the school to a 5-hectare plot of land in Centro Poblado 6, expanding the capacity to more than 600 students. After 20 years of efforts, this work is materialized in the present regional management, thanks to the joint effort between the GORE Tacna Studies Sub-Management and the educational community.

In addition, the new infrastructure will promote the technical training of high school students, who during the five years of study receive more than 1,300 hours of training in computer science, food industries and oil extraction, graduating as auxiliary technicians with the possibility of validating their studies with local technological institutes.

🔍 Key Information

📄
Tender Reference No.
528846019
📅
Publication Date
13 Feb 2026
🌐
Sector
Infrastructure and construction
📝
Notice Type
News
📍
Location
Peru

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 13 Feb 2026
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Peru
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…