📋 Tender Overview
It is demonstrated that political will added to technical experience is key to solving problems inherited from previous administrations.After more than a decade of abandonment and direct harm to hundreds of Piurans, the Provincial Municipality of Piura (MPP) has achieved a feat in public management by unblocking and signing the contract for the comprehensive rehabilitation of the drinking water and sewage service in the A.H. Tupac Amaru I and II Stage, in the Twenty-sixth of October district. This work, with an investment of close to S/ 7 million, will directly benefit more than 8,200 residents of the area.
The achievement of resuming this project, which was paralyzed for more than 12 years, is attributed to the experience and management capacity of Mayor Gabriel Madrid Orue. The signing of the contract was possible thanks to effective coordination with the technical team of the Ministry of Housing, Construction and Sanitation, demonstrating that political will added to technical experience is key to solving problems inherited from previous administrations.
The project will be executed within a period of 134 calendar days and includes a complete intervention of the system. This includes the replacement and expansion of home connections, the installation of new water and sewage networks, and the repowering of the existing tubular well. This repowering will guarantee a more efficient service by incorporating new control panels, chlorination equipment and a modern vertical turbine pump adjusted to population demand.
As part of the comprehensive intervention, the work also includes the paving of the most affected sections of the main avenues in the sector, including 3,426.89 m2 of rigid pavement on Alameda Peru Avenue and 2,480.92 m2 on Yugoslavia Avenue. Additionally, the MPP coordinates with EPS Grau for the appointment of a supervisor, guaranteeing technical monitoring throughout the execution.