📋 Tender Overview
Monteput d.o.o. announced a public call for the conceptual design of the fast road Crn?a - Pljevlja – Goražde, section Crn?a - Pljevlja - border with Bosnia and Herzegovina, length ~ 93 km.
The main objective of this call is to develop detailed technical documentation with a focus on research and defining the optimal corridor of the route of the high-speed road Crn?a – Pljevlja - Goražde. The development of the conceptual design aims to specify the optimal route, creating the basis for further phases of project documentation and future construction of this important road.
Given that in the previous period no planning and technical documentation was made that treated this route, it is necessary to make a Conceptual Design that should serve as a basis for the final commitment and definition of a more precise position of the corridor of this high-speed road in the Proposal of the Spatial Plan of Montenegro by 2040.
In the design process, emphasis should be placed on a multidisciplinary approach, with consideration of technical, economic, spatial, environmental and other aspects, while respecting the prescribed conditions and applying modern technical and technological methods.
The approach involves careful consideration of spatial planning aspects, including the selection of the optimal route, the location of denivelled intersections, toll booths, accompanying and functional facilities, environmental impacts, existing infrastructure, cultural property, religious buildings and other relevant factors for making decisions on the route.
In the development of conceptual designs, the designer is obliged to comply with legal regulations, technical regulations and standards related to design and valid in Montenegro. TEM standards and recommended practice are considered basic guidelines for road design.
This high-speed road aims to provide a quality traffic connection between Bijelo Polje and Pljevlja, and ultimately improve the traffic connection between Montenegro and Bosnia and Herzegovina.
Also, this road and further through Gorazde provides the connection of the Highway Bar-Boljare with corridor Vc.