Railways

Modernization Kamptalbahn Continues Tender

📄 Tender ID: 521871818 📅 Published: 21 Aug 2025

📋 Tender Overview

From September to mid -December there are no trains between Langenlois and Sigmundsherberg
Rosenburg and Kamegg stops will be future for the future
OBB & LAND NO continues to be committed to attracting the regional train
The course for modernizing the Kamptalbahn are set. In the previous year, the Gobelsburg stop and the tracks between Horn and Rosenburg were modernized, in autumn 2025 the focus of the work is on the north section of the route. The construction program includes the renovation of the Rosenburg and Kamegg stops and the relocation of new tracks between Rosenburg and Gars-Thunau. In order to ensure even more security for road users, further railway crossings are technically secured. The preparatory work has been running since the beginning of August.
From 01.09.2025, 02:00 am 14.12.2025, 02:00 oclock in the Langenlois section to Sigmundsherberg do not drive any trains. The OBB nevertheless offer a reliable range of mobility and set up rail replacement traffic by bus. The buses partially take off at changed times. With bicycles it is not possible to use the rail replacement buses.
Enjoyment for the customers: Inside: between Langenlois and Hadersdorf am Kamp can continue to drive according to the timetable during the construction work. Langenlois and Gobelsburg Coming from Vienna remain accessible by train, in Langenlois towards Gars-Thunau and Horn. The buses commute between Horn and Sigmundsherbeg and offer ideal connections to the Rex trains from Vienna
Every modernization step on the Kamptalbahn brings us closer to the goal of creating an attractive, safe and climate-friendly rail connection for the people in the region. The investments of the OBB-Infrastructure AG in the route are a commitment to the expansion of this regional train, emphasizes Judith Engel, director of the OBB infrastructure AG.
We have been modernizing the Kamptalbahn step by step since 2023. Now our Lower Austria railway offensive is going into the next round. With the barrier-free conversion of Kamegg and Rosenburg, all trains can keep in Kamegg again from the timetable change. Pendant driving time. LH-Dep. Udo Landbauer as the Lower Austrian State Council responsible for traffic.
Modernization of the Rosenburg stop
The Rosenburg stop is being converted into a contemporary traffic station and the existing waiting room in the listed station building is barrier -free. The platform will be extended and increased at 100 meters for the future use of the battery brackets from 2028 on the Kamptalbahn line and equipped with modern passenger information. At the Rosenburg section of Rosenburg-Gars-Thunau, the tracks are renewed over a length of around 4 km to the fully. This is where the very long quick conversion train is used, which is amazed at small and large.
Low-floor trains hold in Kamegg
Earlier than originally planned, the barrier -free trains of the 5022 (Desiro Classic) series can now also hold in Kamegg from December 14, 2025 and close a tact gap. The platform is modernized in the course of the construction work and extended to 100 meters. The platform edge is also raised and the introduction to the trains is also more comfortable.
Technical security of railway crossings
It is also modernized at the interface to streets. Two railway crossings in Kamegg, two in Stallegg, and one railway crossing in Zaingrub and Mold are technically secured. The backup is either with light signs or with light signs and barriers.
Step by step future fit
The numerous measures serve to make the Kamptalbahn future fit until 2031. The passengers and residents: Inside, you can look forward to shorter travel times, technically secured railway crossings as well as modern trains and train stations. The new Kamptalbahn also creates the prerequisite for the use of modern battery drafts (from 2028), in order to become a forward model for more climate -friendly mobility. In addition, the Park & Ride and the Bike & Ride offer is expanded along the route. This bundle of measures ensures that switching from the car to the environmentally friendly train becomes even easier.

🔍 Key Information

📄
Tender Reference No.
521871818
📅
Publication Date
21 Aug 2025
🌐
Sector
Railways
📝
Notice Type
News
📍
Location
Austria

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 21 Aug 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Austria
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…