📋 Tender Overview
During his visit to Tashkent region, President Shavkat Mirziyoyev inspected the new overpass built at the intersection of A-373 and Tashkent highways.
This facility serves to effectively organize the flow of traffic, increase road safety, reduce traffic jams, and reduce the travel time between Tashkent and Nurafshon by 10-15 minutes.
The cost of the project, built on an area of 14.1 hectares in the area where Bektemir and Orta Chirchik districts are connected, was 240 billion soums. The facility includes a 66-meter-long, 46-meter-wide bridge, a 450-meter underground highway, two turning lanes, four underground pedestrian crossings, and a 950-meter ring road. Also, 9.5 kilometers of pedestrian and bicycle paths, eight public transport stops, 240 outdoor lighting lamps and 6 kilometers of road barriers were built.
As a result of the launch of the new facility, the daily capacity of the route will increase several times and reach 130 thousand vehicles. This will serve to further improve transport links between the capital and Tashkent region, eliminate traffic jams, and create comfortable movement conditions for the population.
The President was also informed about the technical solutions of the project, the possibilities of managing the traffic flow, and the plans to launch a high-speed bus system (BRT) on the Tashkent-Nurafshan route in the future.