📋 Tender Overview
TACNA, February 20, 2026 - With the objective of safeguarding the hydraulic infrastructure and guaranteeing the safety of the population, the Regional Government of Tacna, through the Tacna Special Project (PET), and the Ministry of Housing, Construction and Sanitation (MVCS), carry out strategic channeling works at the critical points of the Caplina River.
This intervention is developed under the Our Cities program, an articulated effort that allows the deployment of heavy machinery--specifically a John Deere 350G tracked backhoe--in the upper area of the Challata intake. These technical tasks seek to optimize water flow and mitigate the risks of overflows that usually occur during the flood period.
Preventive actions and technical monitoring
In addition to earthworks, the PET technical team carries out the strategic opening of floodgates and maintains permanent monitoring of the flow. Eng. Alonso Mamani Antipuertas, from the PET Infrastructure Management, stressed the importance of anticipating natural phenomena:
One of the most vulnerable points during the rainy season is the entry of landslides into the intakes, which can seriously compromise the water supply and the integrity of the infrastructure. These preventive works are essential to protect our systems and provide peace of mind to citizens, said Mamani.
Commitment to water security
The inter-institutional alliance between the PET and the Ministry of Housing reflects a proactive management model. By intervening in advance, the operation of water collections, a vital resource for human consumption and agriculture in the region, is ensured.
With these actions, the Tacna Special Project reaffirms its role as a monitoring and executing entity, always prioritizing the protection of water sources and the resilience of Tacna families in the face of climate challenges.