Infrastructure and construction

Ministry Construction Entire Tender

📄 Tender ID: 524563740 📅 Published: 01 Nov 2025

📋 Tender Overview

The Ministry of Construction has just issued Official Telegram No. 82, requesting affiliated units and local Departments of Construction to continue to synchronously and effectively deploy response measures, urgently overcome the consequences of rain and floods, and soon stabilize peoples lives. Floods and rains caused landslides and severe damage to traffic infrastructure in Quang Ngai - Photo: XD Newspaper In order to restore production and business in the Central region, especially on key traffic routes to serve peoples lives and transport relief goods according to the direction of the Prime Minister in Official Telegram No. 204/CD-TTg dated October 30, 2025, the Ministry of Construction requires units to focus on leading, directing, reviewing and updating methods. project and proactive response measures at the highest level; Anticipate the worst scenarios to ensure the safety of peoples lives, not to be passive or surprised in any situation. Proactively take the highest response measures. The Vietnam Road Department is assigned to focus on inspecting and reviewing areas at risk of flooding, landslides, and flash floods to have a plan to handle and classify traffic from afar; At the same time, coordinate with media agencies to promptly inform local people. The Department of Roads needs to arrange guards to guide traffic at locations at risk of deep flooding and rapid flow, especially through underground, overflow, ferry terminals, pontoon bridges, and ferry crossings; Appoint guards, install buoys, fences, and signals in locations where roads are deeply flooded, underground overflows, broken roads, landslides, etc. Resolutely do not allow people and vehicles to pass when there is still a risk of unsafety. For locations with major landslides and slides causing traffic jams, the Department of Roads must direct the management and maintenance units to coordinate with localities to immediately deploy a remote channelization plan, urgently fix the problem, and ensure the fastest traffic clearance. Units need to be proactive and ready to support and coordinate with the Department of Construction of localities with congested national highways to overcome and ensure route clearance, especially in the arrangement of vehicles, equipment, and supplies to overcome the traffic jams. Quickly restore collapsed traffic routes, serve the transportation of relief goods and travel of people when required. Strictly implement the patrol and guard regime at construction sites. For the railway sector, the Ministry of Construction requires the Vietnam Railways Department and Vietnam Railway Corporation to strictly implement the patrol and guard regime at important and key constructions and locations such as bridges and roads that are easily flooded; Areas prone to flash floods, steep passes at risk of falling rocks and landslides, railway areas near downstream dykes, irrigation dams, and water reservoirs. RELATED NEWS Units must concentrate vehicles, supplies, equipment and human resources to overcome the consequences of rain and floods, ensuring smooth traffic in the fastest time; Proactively plan to stop ships, stretch ships, increase decks, and transfer passengers when floods cause flooding and slippage in areas where ships must be stopped. The Vietnam Maritime and Waterways Department is responsible for requiring watercraft anchored near river crossing bridges to urgently relocate to a safe location, absolutely not allowing them to drift or collide with river crossing structures. This agency also needs to urge inland waterway management and maintenance units to promptly recover buoys and signals before flooding. about or when there is a flood discharge notice; redeploy the buoy and signal system immediately after floods. For the aviation sector, the Ministry of Construction directed to strengthen inspections of airports, railway stations, communication systems, operations, and flight command to promptly detect and handle incidents. Airlines need to closely monitor weather developments to adjust flight schedules, flight routes, and arrival terminals accordingly, ensuring absolute safety when there is heavy rain or bad weather. The Department of Economics - Construction Investment Management can assigned to direct Project Management Boards, investors, construction contractors and related units to implement solutions to ensure construction safety and prevent landslides during the rainy season; At the same time, prepare conditions to promptly fix construction problems, coordinate to ensure smooth traffic on roads that are both under construction and exploitation. The Departments of Construction in the Central region closely coordinate with local authorities, branches, Road Management Areas and units that manage and repair roads, railways and waterways to proactively overcome incidents caused by floods; Conduct traffic diversion and ensure traffic on assigned management routes. At the same time, coordinate with the road and railway sectors in arranging vehicles, equipment and supplies to quickly overcome landslides, serve the transportation of relief goods and travel of people when required. All relevant agencies and units are on duty 24/24h, promptly reporting to the Civil Defense Command of the Ministry of Construction.PT

🔍 Key Information

📄
Tender Reference No.
524563740
📅
Publication Date
01 Nov 2025
🌐
Sector
Infrastructure and construction
📝
Notice Type
News
📍
Location
Viet nam

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 01 Nov 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Viet nam
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…