📋 Tender Overview
Lithuanian Electricity Transmission System Operator Litgrid Is Implementing Projects For Resistance Of Critical Electricity Infrastructure. The Baltic States Have Successfully Joined The Continental European Synchronous Zone In February To Ensure The Reliability Of The Power Transmission System, Which Will Implement Different Measures That Will Strengthen The Electrical System Resistance To Hybrid Threats. On Monday, The Main Measures Of The Neris Transformers Maintess Zygimantas Vaiciunas Were Presented To The Minister Of Energy, The Testing Of Which Is Already Completed. The Implementation Of Infrastructure Resistance Measures Is Necessary In The Light Of The Regional Security Situation And Real Incidents, So We Take A Wide Range Of Measures To Maximize The Critical Energy Infrastructure. The Baltic Sea Region Would Become A Model Model To Strengthen The Safety And Resistance Of Critical Infrastructure Throughout Europe, Says Minister Of Energy Zygimantas Vaiciunas. Together With Other Representatives Of The Lithuanian Energy Sector, We Went To Ukraine, Visited The Transmission Network Objects, Visited What Security Measures Were Being Applied, We Were Planning Our Actions. Last Year We Initiated The Litgrid Critical Infrastructure Resistance Program. It Consists Of More Than 150 Measures Implemented In Individual Transmission Network Objects, Which Includes Protective Barriers, Territorial Perimeter Protection, Drone Neutralization Solutions, As Well As Measures For The Operation Of The Affected Infrastructure. A Significant Part Of The Measures Is Not Publicized For Security Reasons, Says Rokas Masiulis, Ceo Of Litgrid. Litgrid Implemented The Energy Infrastructure Resistance Program Includes Strengthening Of Critical Equipment, Transmission Network Facilities For Emergency And Crisis Reserve Formation, Electronic Safety Measures, Installation Of Unmanned Aircraft Detection And Neutralization Systems, Perimeter Protection Enhancement. A Total Of 13 Projects Are Implemented In The Program. The Program Is Constantly Reviewed, Taking Into Account The Assessment Of Threats And New Technological Solutions. On February 8 This Year, The Baltic States Disconnected From The Russian -Controlled Ips / Ups Electrical System, And On 9 February Successfully Connected Their Electrical Systems With The Continental European Synchronous Zone. Synchronization With Continental Europe Enables The Baltic States To Control Its Electrical Systems In Close Cooperation With Other Continental Europe Countries, Ensuring Stable And Reliable Frequency Regulation, Thus Strengthening Energy Independence And Increasing Energy Safety Throughout The Region. The Baltic States Have Joined The Continental European Network Serving More Than 400 Million. Consumers In 26 Countries. About Litgrid: Ab Litgrid, Operator Of The Lithuanian Electricity Transmission System, Maintains Stable Operation Of The CountryS Electricity System, Controls Electricity Flows And Enables Competition In The Open Electricity Market. The Company Owns About 7 Thousand People In Lithuania. Km Of Airlines, Over 300 Km Of Cable Lines, More Than 240 Transformers Substations, 9 Inter -System Lines And Connecting With Other Countries, Constantly Undergo Maintenance Of The Electricity Network Infrastructure To Ensure Proper Transmission Of Electricity To All Residents, Institutions And Other Organizations. Since 2010 December 22 The Shares Of Litgrid Ab Are Included In The Nasdaq Vilnius Stock List Of The Nasdaq Vilnius Stock Exchange. 97.5 Percent Litgrid Ab Is Owned By The Epso-G Group Of Energy Transfer And Exchange Companies, Which Are 100 %. The Shares Belong To The Ministry Of Energy Of The Republic Of Lithuania.