📋 Tender Overview
The Slovenian Water Directorate has implemented measures to stabilize the riverbed and protect the banks from lateral erosion on the Soca River near Cezsoca. In recent years, the river has already washed away around 14,000 square meters of private land in this area, and a medium-voltage electrical cable has also been threatened.The works included the redirection of the main flow of the river, which ensured a more hydraulically favorable flow axis and enabled the implementation of works in dry conditions. For additional protection, weirs made of wooden piles and rocks were built, filled with debris. The next phase will include the planting of willow cuttings, which will strengthen the banks in the long term. The measure is primarily intended to prevent further land loss and protect infrastructure. The redirection of the main flow of water that was implemented is not a permanent channelization of the river, but a technical measure for a more hydraulically favorable flow axis and for the implementation of works in dry conditions and without hardening. Sustainable solutions were used in this, in accordance with legislation and positive nature conservation opinions. The purpose of the measures is to reduce the impact on the environment, while ensuring the safety of people, property and riverside infrastructure. The value of the works is approximately 161,000 euros and was financed from the Public Service Work Program in the Soca area for 2025. The construction works have been completed, and the willow planting will be carried out by the end of 2025. Implementation of works on the Soca River 1 / 3