📋 Tender Overview
Millions of residents will benefit from this important road project that will modernize 4.96 km of metropolitan roads.As part of the progress of the new Juan Pablo II expressway project, the metropolitan mayor of Lima, Eng. Rafael Lopez Aliaga, supervised the lifting of three prestressed concrete beams, one of the most relevant stages within the construction process of the new elevated viaducts that are part of this modern road infrastructure.
The lifting of beams included the transfer and placement of large prestressed concrete structural elements, installed with the support of specialized cranes and qualified technical personnel. This procedure demands high precision and safety control, since the beams will form the structural base that will support the bridge slab, allowing the connection between both ends of the road.
This activity represents a crucial advance in the execution of the first viaduct, corresponding to the intersection of San Juan Avenue and Pista Nueva Avenue, where work is currently also underway on the construction of the access on the right side and the preparation of the base in the adjacent sections.
Its comprehensive intervention covers 4.96 kilometers of metropolitan roads, with the expansion of the vehicular road to three lanes in each direction, with concrete and asphalt pavement, as well as the construction of a new bicycle lane, promoting more sustainable, safe and modern mobility.
Likewise, the project includes the installation of signage and traffic lights, in addition to the treatment of green areas, improving the urban environment of both districts. Among its most notable components are the three elevated overpasses, which will optimize vehicular traffic and strengthen connectivity in southern Lima.
With this work, the mayor of Lima reaffirms his commitment to the development of a modern and efficient road infrastructure, for the direct benefit of thousands of residents of San Juan de Miraflores and Villa Maria del Triunfo.