The Regional Government of Arequipa continues to promote the construction of the Matarani Health Center, a work that currently registers a physical progress of 14.25% and will benefit approximately 9,900 inhabitants of the Matarani population center, in the province of Islay.
The I-3 category health facility runs over an area of 956.86 square meters and will have a five-level modern infrastructure, including a basement. The new health center will have medical offices, a clinical laboratory, radiology and dentistry services, mental health and rehabilitation areas, environments for emergencies and immunizations, as well as administrative spaces.
Currently, the basement has the structure finished in gray hull. At this level footings, retaining walls, columns, beams and lightened slab were executed. In these environments there will be offices, a pump room, a hyperbaric chamber, toilets and other complementary spaces. In the following stages, plastering, painting, installation of doors and other finishes will be carried out.
The construction resident, engineer Jose Manuel Rodriguez, reported that the structural work on the first level has already been completed and that the construction of the second floor is currently continuing according to the established schedule. In this stage, formwork work is carried out on the second level, plastering of the cistern and filling and compaction work. Subsequently, concrete will be poured into columns to continue with the advancement of the structure.
The work is carried out through the Tax Works modality with an investment of 30 million 631 thousand 637.53 soles and has the participation of 77 workers, between 15 technicians and 62 workers, who carry out the necessary tasks to meet the established deadlines.