📋 Tender Overview
Dak Lak is the locality that suffered the heaviest damage, currently there are 96,395 customers and 1,068 transformer stations that cannot be energized due to unsafe field conditions. The electricity industry urgently fixed the problems to restore power supply in flooded areas. On the morning of November 23, the Central Power Corporation (EVNCPC) said that by 6:30 a.m. today, power supply had been restored to 1,061,858 customers, reaching 89.15% of the total number of customers affected by widespread flooding in recent days. Although many areas are still deeply flooded, operations management teams are still on duty. 24/24, trying to handle incidents and ensure safety for people and equipment. There are currently 129,227 customers in Gia Lai, Dak Lak and Khanh Hoa who have not been able to turn on power due to unsafe field conditions. During this heavy rain, the entire EVNCPC had 1,191,085 customers without power and 13,999 distribution transformer stations were affected. By this morning (November 23), 12,442 stations were back in operation (reaching 88.88%), while 1,557 stations, equivalent to 2.71%, had to wait for the water to recede to continue processing. The total capacity that cannot be restored is estimated at about 65.1 MW, accounting for 1.68% of the systems maximum load. Dak Lak is the locality suffering the heaviest damage when there are 96,395 customers and 1,068 transformer stations that cannot be energized, the capacity loss is about 50.1 MW. In Gia Lai, there are 3,106 customers and 94 transformer stations that are temporarily suspended, the lost capacity is estimated at 3.2 MW. MW. Khanh Hoa alone still has 29,726 customers without electricity, of which Khanh Hoa Electricity Company (former Ninh Thuan area) manages 1,110 customers, while Khanh Hoa Electricity Joint Stock Company manages 28,616 customers and 359 transformer stations, with an unrestored capacity of about 11.4 MW. Currently, electric companies are still mobilizing total human resources and equipment, handling problems immediately. When the water recedes, with the principle of only turning on power when ensuring absolute safety. EVNCPC aims to restore all load as soon as weather and field conditions allow. Currently, power companies are still mobilizing all their human resources and equipment to handle problems as soon as the water recedes. Nhat AnhRefer moreRefer moreRefer moreRefer moreRefer moreRefer more