Railways

Maintain Good Relationships Tender

📄 Tender ID: 519201653 📅 Published: 16 Jun 2025

📋 Tender Overview

13.06.2025 We maintain good relationships between Wielkopolska and Lower Silesia for the coming years we will provide good connections of Wielkopolska with Lower Silesia. On the railway line Ostrow Wielkopolski - Grabowno Wielkie will renovate the track and rebuild the platforms. In this way we will increase comfort and improve safety. Soon we are starting investments for PLN 154 million (net) from the KPO, thanks to which in the first half of 2026 passengers will gain more convenient travels. We entered the contract for over PLN 85 million net to work on work on the Lower Silesian section of the Ostrow Wielkopolski - Grabowno Wielkie Wielkie Line, while in the coming week we provide the construction site of the contractor, which will start the renovation of the Wielkopolska section, which will start the renovation of the Wielkopolska section, which will start the renovation of the Wielkopolska section Ostrow Wielkopolski and Miedzyborz Sycow. Thanks to this, we will maintain good parameters of the route, and as a result - convenient travel by rail. We deal with robots in Greater Poland Travel standard, modernizing 7 stations and stops located on the route. Passengers will gain better conditions in Popola, Tarchalach Wielkie, Odolanow, Garki, Graniowiec, Sosnia and Pawlow Wielkopolski. We will set sheds and new benches on high platforms. We will install bright, ecological lighting. Travels will be facilitated by clear marking and information display cases with useful messages. For people who have difficulty moving, we will prepare ramps, and for the blind passengers on the non-slip surface we will install guidance paths. For over 30 km of section between Ostrow Wielkopolski and Miedzyborz Sycow we will strengthen the ground and replace the rails in places that require it. The investment will cover the renovation of 3 engineering facilities. We do not forget about security-we want to renovate 6 rail-road crossings, including In Topola, Odolanow and in Sosnia, where drivers will gain new travel devices. Prace in Lower Silesia start soon on June 10, we signed a contract for the second stage of work - works on the Lower Silesian section, between Miedzyborz Sycow and Grabown Wielki. Caring for the comfort of travelers, the contractor will rebuild three platforms: in Miedzybor Sycowski, Bukowina Sycowska and Twardogora. It will also provide convenient access to them, building the right access. The track surface will be renovated and strengthened on a 20 km route. We will also replace 7 switches. Dehydration will be carried out. The contract of the contract includes renovation or reconstruction of 33 engineering facilities: 24 culverts, 7 viaducts and 2 retaining walls. On the Lower Silesian route, safety will be improved at 12 intersections of the road with tracks. Five journeys: in Miedzyborz Sycowski, Bukowina Sycowska and Twardogora will gain additional security in the form of light and sound signaling. On the project Works on railway line No. 355 Ostrow Wielkopolski - Grabowno Wielkie we allocated a total of PLN 154 million (net) from the national reconstruction and increased resistance plan (KPO). Robots on the Wielkopolski section, for PLN 68.1 million (net), on our order, will be carried out by Zaklad Robot Komunikacyjny DOM Sp. z o.o. from Poznan. Works on the Dolnoslaskie section, for 85.9 million (net), will implement a consortium composed of: Infrakol Sp. z o.o. Sp. Komandytowa, LWZ Sp. z o.o., Trakcja System Sp. z o.o. Favorable changes on the route Ostrow Wielkopolski - Miedzyborz Sycow travelers will feel at the end of this year, when we plan to complete this stage of the investment. For the implementation of the second stage, the Contractor has time until mid -2026. We will carry out the trade in communication using specialized equipment, including Podbiebijarek and crushed stone purifiers. This will guarantee the proper performance of works and will eliminate indispensable changes in traffic on a single -track line. From Sunday (June 15), in consultation with the carriers, between Ostrow Wielkopolski and Miedzyborz Sycow, regional trains will replace buses. Large -distance trains will be directed by the route through Krotoszyn. Detailed information is available on platforms and on the passenger portal ().

🔍 Key Information

📄
Tender Reference No.
519201653
📅
Publication Date
16 Jun 2025
🌐
Sector
Railways
📝
Notice Type
News
📍
Location
Poland

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 16 Jun 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Poland
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…