Bridges and Tunnels

Longest Underwater Highway Tender

📄 Tender ID: 516860567 📅 Published: 14 Apr 2025

📋 Tender Overview

On April 9, the construction of the Haitai Yangtze River Tunnel made a major breakthrough. The domestic super-large diameter shield machine Jianghai with a maximum excavation diameter of 16.64 meters was successfully launched, marking the official start of the tunnel construction. The Haitai Yangtze River Tunnel is located in the lower reaches of the Sutong Yangtze River Bridge in Jiangsu Province, starting from Haimen District in Nantong in the north and ending at Taicang City in Suzhou in the south. It adopts the design standard of a two-way six-lane expressway with a designed speed of 100 kilometers per hour and a total length of 11 kilometers. The tunnel shield section is 9,315 meters long, making it the longest underwater highway shield tunnel in the world. After the tunnel is completed, the traffic pressure on the Sutong Yangtze River Bridge will be effectively relieved and efficient interconnection between Nantong and the 1-hour economic circle of southern Jiangsu and Shanghai will be achieved. Since the tunnel construction was officially launched in September 2022, the Jiangsu Provincial Transportation Engineering Construction Bureau has continued to promote engineering and technological innovation and organized the development of two intelligent super-large diameter shield machines with internationally leading levels, providing core equipment support for tunnel excavation construction. The Jianghai shield machine started this time is 145 meters long, weighing about 5,000 tons, and has a total installed power of 11,300 kilowatts. It has reached the international leading level for many technical parameters and undertakes the right-line tunnel shield excavation task undertaken by China Railway 14th Bureau. Faced with the complex geological conditions at the bottom of the river, Jianghai has carried out innovative research on nine major systems, including cutting board tools, main drive, propulsion, and synchronous grouting. It has equipped soft soil cutting boards with normal pressure tool change function and cutting tools with high hardness and wide coverage to improve the operation efficiency of complex formations. At the same time, it adopts a telescopic main drive system and applies the fourth generation of synchronous grouting technology to ensure safe, efficient and intelligent excavation of shield tunnel construction in all aspects.

🔍 Key Information

📄
Tender Reference No.
516860567
📅
Publication Date
14 Apr 2025
🌐
Sector
Bridges and Tunnels
📝
Notice Type
News
📍
Location
China

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 14 Apr 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country China
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…