📋 Tender Overview
01.09.2025 Line to Zlotoryja with new possibilities-changes for the better in the Railway+program We do not give up the revitalization of the Legnica-Zlotoryja-Jerzmanice-Zdroj railway line. After arrangements with the Marshals Office, we decided to expand the scope of the investment. Thanks to PLK to Jerzmanic-Zdroj, heavier freight warehouses will arrive, and the station itself will be prepared for subsequent investments planned by the local government towards Wojcieszow and Lwowek Slaski. From 2023, we implement the project Revitalization of the Legnica-Zlotoryja-Jerzmanice-Zdroj section in order to include Zlotoryja and the Zlotoryj poviat in the regional rail transport network. It is an investment of fundamental importance for the development of: Zlotoryjski, Lwow and Karkonosze. The restoration of railway connections to Zlotoryja will open new perspectives for residents, strengthen the economy and tourism, reduce communication exclusion and provide ecological transport. - In order to ensure a higher standard of travel and better technical parameters, we revised the program. It will allow to achieve higher operating values, which in consequence will allow carriers to prepare a more attractive offer-said Daniel Dygudaj, director of the Railway Lines Department in Wroclaw PKP Polskie Linie Kolejowych S.A. Station in Jerzmanice-Zdroj will be rebuilt so that in the future it will enable the connection of connections towards Wojcieszow and Lwowka Slaski. Thanks to this, the line will be better related to the regional railway network from the beginning and prepared for long -term development. The project already provides for solutions that will increase the competitiveness of rail transport in the Lower Silesian Voivodship. According to the original assumptions, passenger trains from Zlotoryja to Wroclaw will go in about 70 minutes. The maximum speed on the route will be up to 120 km/h. Torah, traction network and rail-road crossings will be modernized, which will increase the safety and comfort of users. A new Legnica Zosinek stop will be built. The platforms will have sheds, benches, lighting and clear marking. Investment is conducted in a safe, effective and least burdensome way for residents and business partners. PLK SA takes into account the needs of the local economy - including Legnica copper smelters - ensuring continuity of rail service during works. The project also assumes adaptation of railway infrastructure to parameters more conducive to transport of goods. The tracks will be prepared so that freight trains can go at a speed of up to 100 km/h and transport heavier goods. The work is implemented in the design and build formula, which allows you to take into account the needs of partners and society on an ongoing basis. The investment goes on as planned and we do not intend to stop it. Completion of works was scheduled in 2028. The extension of the term results from the need to introduce the previously mentioned better design solutions that will improve the geometry of the track, increase the level of security and prepare a line for further development. Thanks to this, the investment will bring residents and the economy of the region permanent and measurable benefits. The projects value is about PLN 263 million, financed from the Program for completing local and regional railway infrastructure - railway.