📋 Tender Overview
In order to support the development of photovoltaics in Luxembourg and to increase the proportion of electricity produced thanks to solar energy, the Ministry of the Economy is launching two new tenders in order to motivate companies to set up and exploit major photovoltaic power plants. An important novelty: the introduction of specific sub-plots for power plants equipped with storage device. As in 2024, the two calls were launched simultaneously. On the one hand, with the success of the calls for tenders launched in 2022, 2023 and 2024, a fourth appeal in order to obtain investment aid for the realization and exploitation of photovoltaic power plants is launched, while in parallel, a seventh call for projects in order to obtain aid in operation is also launched. Investment aid encourages, in principle, companies to produce, in whole or partially, their own energy thanks to the granting of a subsidy, paid at the time of commissioning of the photovoltaic power station, while operating aid allows, in principle, the company to conclude a market bonus contract, over a period of 15 years, during which it will be remunerated according to the electricity produced and injected in the network. Interested companies thus have the choice between the two types of aid and are free to assess the best option according to their needs and expectations, and their specific situation, in particular compared to their electricity consumption and the surfaces they have to install photovoltaic panels. Compared to the calls of 2024, the lot designated as innovative, aimed at building power plants whose construction is not considered classic (power plants mounted on the facade of buildings, and power plants using light modules on roofs), is maintained in the two calls, as well as specific lots for car park carports/shades (also in the two appeals). Top-up for batteries on investment aid The novelty with regard to the appeal for investment assistance lies in the fact that, for each batch, sub-plots dedicated to photovoltaic installations with batteries are now integrated. They aim to encourage companies to install batteries by offering them higher subsidies that take into account higher investments, in order to try to optimize the use of produced electricity (self -consumption, sharing, terminals, etc.) thanks to storage. The fourth call for tenders with a view to obtaining investment aid has an overall budget of 20 million euros, divided into three lots: lot 1:> 30KWC and <=3MWC (Building roofs; ZAE land) 1A Sublot: Without 1B sublot batteries: with Lot 2:> 30KWC and <=2mwc innovative batteries (on a building: Light, facade modules) 2A sublot: without 2B sublot batteries: with batteries Lot 3:> 30KWC and <=3MWC (umbridies) 3A sublot: without batteries sublot 3B: with batteries the seventh call for tenders in order to obtain operating aid offers a total power of 45 MW to be allocated, distributed in four lots: Lot 1: <=20MWC Lot 2: Building roofs Sublot 2a:> 200kwc and <=500kwc Sublot 2B:> 500KWC and <=3mwc lot 3: Innovative (on a building: roofs with light modules, facade modules) 3A sublot:> 200kwc and <=500kwc 3B:> 500KWC and Lot 4: Shadows and water basins sublot 4A:> 200KWC and <=500KW 4B:> 500KWC and <=3MWC sublot to submit a project to benefit from aid, companies have respectively until October 17, 2025 (investment aid) and until November 28, 2025 (operating assistance). Aids are allocated according to the principle of competition. All information on the two aids can be consulted online from today under the following links: in order to explain to companies all the details and practical terms of these tenders, two free information webinars will be organized with the support of the National Innovation Agency, Luxinnovation, during the week of September 15 to 19. Webinaries will focus on new products and change of tenders and all questions concerning both types of aid can be addressed. The Minister of Economy, SMEs, Energy and Tourism, Lex Delles, comments: The acceleration of renewable energies development is one of the governments priorities and photovoltaics is increasingly important in this context. With the simultaneous launch of these two new tenders, companies have more flexibility to opt for the help that best suits them to install power plants Photovoltaics.to encourage as many players as possible to participate actively in the energy transition. In addition, sub-plots specifically dedicated to photovoltaic installations with batteries have been integrated into the call relating to investment aid. This measure aims to strengthen financial support for companies wishing to invest in an electrical storage system. These new sub-plots are fully part of the guidelines defined by the strategic roadmap for the promotion and development of electricity storage batteries in Luxembourg Spaicerstrategie letzebuerg, presented on July 9 .