Roads and Highways

Latvia Daugavpils Highway Tender

📄 Tender ID: 488394501 📅 Published: 17 May 2023

📋 Tender Overview

On Daugavpils highway A6 near Pavias in the section from the Pavii dolomite rubble quarry to the traffic junction of the A6 P37 and V772 motorways the rotation circle km 118.49128.97 begins to restore the pavement but reconstruction works are underway at the traffic junction itself. Repair works are also continuing on the overpass over the railway in the 124th kilometer of Daugavpils highway.During the pavement restoration phase the speed limit is 70 and 50 kmh and at the junction and on the overpass 30 kmh. Width limit 3 and 3.5 m reverse movement introduced on the railway overpass.Currently the construction section from the railway overpass to the dolomite quarry can be completed in 15 minutes but later drivers will have to reckon with a longer time on the road. All these works are expected to be completed this year.When planning routes along Daugavpils highway it should be taken into account that road construction works are also taking place in Lielvrde km 51.30-56.70 their departure should be planned for half an hour but from Koknese to Stukmai km 102.20-116.05 where vehicle average speed control devices are installed the permitted driving speed has been reduced to 70 and 50 kmh.We urge drivers to be responsible and comply with all traffic restrictions imposed during the construction phasesIn the section from the Pavii dolomite rubble quarry to the rotary circle km 118.49128.97 deposits and cracks will be removed leveling milling will be carried out and a new asphalt concrete binder and dilum layer will be laid at the end.The traffic junction RigaDaugavpilsKraslavaBelarus border Patarnieki A6 Pavias GostiiMadonaGulbene P37 ApusalaVilkukrogs V772 will be rebuilt according to the standard requirements because historically it was very large therefore both when entering and leaving it the division into lanes was often not observed as a result of which traffic accidents occurred.During the reconstruction it is planned to eliminate unnecessary exitexit lanes and node areas - separate connections of the lower category.The supports and beams of the railway overpass A6 km 124 will be retained but the span structure of the overpass which has served its time will be dismantled. A new concrete slab waterproofing sidewalks metal protective barriers stairs at the bridge approaches and a water parting system will be built and two layers of asphalt concrete pavement will be laid on the new carriageway.Construction works at all three objects are carried out by SIA SC grupa construction supervision is provided by SIA Road engineers. The contract price for the construction works for the reconstruction of the pavement is 3 822 781.66 including VAT for the construction of the railway overpass - 1 053 229.60 including VAT for the construction of the traffic hub - 1 334 506.13 including VAT. The author of the reconstruction project for the overpass over the railway is SIA Projekts 3 for the traffic junction of the A6 P37 and V772 motorways SIA Projekts EAE.

🔍 Key Information

📄
Tender Reference No.
488394501
📅
Publication Date
17 May 2023
🌐
Sector
Roads and Highways
📝
Notice Type
News
📍
Location
Latvia

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 17 May 2023
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Latvia
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…