📋 Tender Overview
The construction season continues on the national road network, works are underway at 54 sites. The largest number of repair sections is currently on the country's local roads – 17, on regional roads – 11 and eight on major roads. Also, various works take place on 13 bridges.
We encourage you to follow the traffic organization in repair sites and not to violate the rules of the road.
When planning trips, we invite you to take a look at the repair map on the VSIA Latvian State Roads website www.lvceli.lv, where you can find information about the current stages of construction work and traffic restrictions.
The largest restrictions on the main highways of the country:
on Vidzeme highway (A2) from the turn to C?sis (P20) to R?dzene seven sections of traffic lights. The 0.5 km section behind Drabeši is completely closed to traffic, the section Drabeši–Vaive is bypassed by the Drabeši–L?vi (V293), Valmiera–C?sis–Drabeši (P20) and C?sis–Ramu?i–B?n?ži (V294. Speed limits 50 and 70 km/h, estimated time of crossing the repair stage – an hour;
on Vidzeme highway (A2) from Fungus to Sigulda speed limit 50 and 70 km/h. Traffic along one lane in each direction. Estimated crossing time 20 minutes
on Valmiera highway (A3) from the bridge over the Gauja river to the turn to Lielatraupe (V280) three sections of traffic lights, speed limit 50 and 70 km/h. Estimated time of crossing the repair stage 49 minutes;
on Daugavpils highway (A6) in Lielv?rde in three sections traffic lights, speed limit 50 km/h, width limit 3 m, it takes half an hour to cross the section;
on Daugavpils highway (A6) in the section of P?avi?i ring road speed limits 70 and 50 km/h, crossing time 25 minutes;
On the motorway Russian border (Grebneva)-Rezekne-Daugavpils-Lithuanian border (Medumi) (A13) from Grebneva to K?rsava speed limit 70 and 50 km/h, four sections of traffic lights. It takes 50 minutes to cross the repair stage.
The largest restrictions on the country's regional highways:
at the junction of the motorways Garkalne–Alauksts (P3) and In?ukalns–Ropaži–Ikš?ile (P10) near Thinpe, speed limits of 30 and 50 km/h and a section with a traffic controller;
On the section of the motorway Umurga-C?sis-L?vi (P14) from Stalbe to C?sis, traffic is regulated by traffic lights in six sections. Speed limits of 70 and 50 km/h, estimated time of crossing the repair stage 50 minutes;
on the motorway Valmiera-R?jiena-Estonian border (Unguri?i) (P17) from Valmiera to Renzeni, one temporary traffic light section and in five sections reverse movement is organized with preferential signs, speed limits 50 and 70 km/h. The estimated time of crossing the stage is 40 minutes;
In the section of the motorway Aizkraukle–J?kabpils (P76) from Seces to Daugava station up to two sections of traffic lights and in one section traffic is organized by the regulator, the speed limit is 50 km/h. Estimated time of crossing the repair stage 35 minutes;
on the motorway Valka-Vireši (P23) closed traffic over the Gauja bridge and the Gauja river bridge, bypassing the Valka-Smiltene motorway (P24), on the way must be planned up to 25 minutes;
On the motorway Tukums-Auce-Lithuanian border (P104) from Zebrene to Auce, traffic is organized in one section by a regulator or with temporary traffic lights. Speed limits of 50 and 70 km/h. Estimated crossing time up to 20 minutes;
Three traffic light sections of the Skrunda–Aizpute (P117) section near Kazdang. Speed limits of 50 and 70 km/h. The estimated time of crossing the repair stage is half an hour.
In order to obtain or transfer information about what is happening on State motorways, we invite you to call the VSIA Latvian State Roads round-the-clock informative toll-free phone number 80005555.