📋 Tender Overview
The second stage of slab loading of the Abay bridge is underway, in the Asuncion-Luque section, a work that is part of the Las Residentas Road Corridor. This project seeks to reduce travel times, improve road safety and facilitate the daily movement of thousands of users in the metropolitan area. The work on this phase began this Sunday, while interventions continue on various fronts, with emphasis on water channeling and the consolidation of base structures. In the Ytororo street area, deep drains are currently being executed for the evacuation of groundwater. The tasks on the road section span from km 0.3 to km 1.3 and are carried out in different stages: some sectors already have an improved subgrade, others are in the embankment phase, while in another section unclassified excavations are being carried out to form the base of the embankment. In the viaduct sector, the technical teams are advancing with the excavation and removal of piles intended for the caps. These heavy infrastructure works are complemented by the installation of high-capacity drainage systems. Among them, a simple cellular culvert (1.5 x 1.5 meters) stands out at km 1.0, in the area known as Korean Curve, as well as a triple culvert located in front of an educational institution in the sector. This last structure is integrated into new open-air canals located at km 2.6, 3.1 and 3.8. Stormwater management also registers progress with the construction of a manhole at km 2.6 and the final lining of trapezoidal ditches at km 1.5. In addition, strip cleaning is carried out with heavy machinery at km 1.3, which will help guarantee the durability of the new asphalt pavement against different climatic phenomena. Supervision of the work and attention to citizens Citizens have the telephone line 0985 203 381 to make inquiries or file complaints related to the impacts of the work. The execution of the project is in charge of the company Benito Roggio e Hijos S.A., with financing from Itaipu Binacional and supervision of the Ministry of Public Works and Communications (MOPC). Date: March 9, 2026