📋 Tender Overview
Thanks to the large-scale upgrade, the Northern mini-CHP in Grodno has become even more reliable, and production processes at the enterprise have been digitized.This was reported in the telegram channel of RUE Grodnoenergo, writes sb.by.
At the mini-CHP, worn-out plate heaters were dismantled and a 28 Gcal/h shell-and-tube network water heater, equipped with a condensate cooler and condensate pumps, was installed.
-- We also installed a network water pipeline to increase the temperature of the coolant in front of the boiler.This helps prevent low-temperature corrosion and a decrease in the thermal stress of the heating surfaces of the unit.We replaced the control unit on the line for supplying auxiliary steam to the network water heater, noted RUE Grodnoenergo.
All installed equipment is fully integrated into the overall automation system.Sensors continuously measure temperature, pressure, flow and water level, transmitting these parameters to the central controller.
As a result, the Northern mini-CHP has become even more reliable, and its processes can now be controlled faster and more accurately.This is especially important on the eve of the new heating season.
SB.BY