📋 Tender Overview
Hydrography
Work “Laguna Negra Gates and Canal” reaches 76% progress
06/02/2026
Share
The Hydraulic Area of the National Hydrography Directorate is working on the execution of the work “Laguna Negra Gates and Canal”, one of the works included in the “Water Regulation Plan for the Bañados de Rocha”, approved by Decree No. 229/004, which establishes a comprehensive strategy for the management of the basin's water system.
The project is currently 76% complete and the basic work is expected to be completed in December of this year. The total investment exceeds 39 million pesos and will allow the water system to be organized within the framework of a sustainable model for the Bañados de Rocha.
The intervention consists of a control work with gates, intended to regulate the levels of the Laguna Negra, which together with a channel approximately 20 kilometers long will allow the excess waters of the Laguna Negra to be conveyed to the San Miguel stream and subsequently to the Laguna Merín. In this way, surplus water will be prevented from being discharged into Channel 2 and, finally, into the Atlantic Ocean.
As a consequence, the work aims to minimize the flow of fresh water that reaches the ocean coast, favoring the environmental recovery of the coastal system and contributing to the tourist development of the area.
This work is part of a regional water regulation and management strategy promoted by the MTOP and its main objective is to restore the natural runoff of water towards Laguna Merín, recovering the original direction of the water system, historically altered by canalization works such as the Laguna Negra Este Canal, the Andreoni Canal and Canal 2.
From an environmental, productive and social point of view, it seeks to generate multiple benefits in the region, including: the reduction of flooding in productive areas, the conservation of fresh water, the improvement of environmental and tourist conditions in La Coronilla, the protection of areas of historical and environmental value, as well as the preservation of the wetlands and the natural forest.
Image gallery
1/3
Work “Laguna Negra Gates and Canal” reaches 76% progress
Download image
: “Laguna Negra Gates and Canal” work reaches 76% progress
PreviousNext
Download all images (.zip 2.01 MB)
4 images, 2.01 MB
Tags
Hydrography