📋 Tender Overview
Green energy and local coexistence and prosperity are the most important keys to energy transformation. The governments promotion of green energy will also help accelerate local development. This time, by revising the Landscape and Ecological Environment Approval Principles for the Installation of Ground-based Solar Photovoltaic Facilities, In the early stages of construction planning, the industry should implement specific setback regulations to reduce the possibility of photovoltaic sites affecting surrounding residents, give priority to protecting the rights and interests of local residents, and implement the county (city) government and township ( The town, city, and district offices will use the rebate funds to actually manage the affairs of the photovoltaic project site, while encouraging more people to support the installation of renewable energy and promote the healthy development of the entire region.
Since September 30, 2014, the Ministry of Economic Affairs has invited the Ministry of Agriculture, the Ministry of the Interior, local governments and photovoltaic companies (associations) to draft the Electricity Industry Registration Rules, Self-use Power Generation Equipment Registration Rules, The revised draft of the Regulations on the Administration of the Installation of Renewable Energy Power Generation Equipment was officially announced on January 24 this year, stipulating that when applying for construction permits for ground-based solar photovoltaic facilities, those who install ground-based solar photovoltaic facilities must comply with the Principles for the Landscape and Ecological Environment Assessment of the Installation of Ground-based Solar Photovoltaic Facilities. .
The Ministry of Economic Affairs explained that in response to the publics concerns about ground-based projects near residential areas, the Ministry of Economic Affairs also revised the Landscape and Ecological Environment Approval Principles for the Installation of Ground-Based Solar Photovoltaic Facilities to follow the Ministry of the Interiors non-urban control rules and require that the photovoltaic construction site should have a certain The appropriate distance is 2 hectares as the boundary to reduce the impact on surrounding residents. Including: For sites with an area of more than 2 hectares, the facilities should be at least 20 meters away from the boundary of the area, or at least 15 meters away but with a hedge of more than 1.5 meters in height; if the site is less than 2 hectares, the site should be Relevant regulations such as being more than 5 meters away from the boundary of the area.
In addition, in order to implement the local feedback system, the draft amendment to the Electricity Development Assistance Fund Utilization and Supervision Management Regulations was also revised. It was officially announced on January 24 this year to regulate the recipients of the subsidy-type electricity cooperative funds. The county (city) government and township (city, district) office should each use 50% of the funds for the affairs of the township (township, city, district) and village (village) where the solar photovoltaic project is located, so that the feedback funds can be used for Practically applied to local affairs to assist local development.
The Ministry of Economic Affairs stated that the draft amendments to the Electricity Industry Registration Rules, Self-use Power Generation Equipment Registration Rules, Renewable Energy Power Generation Equipment Installation Management Regulations and Electricity Development Assistance Fund Utilization and Supervision Management Regulations have been published simultaneously on the Ministry of Economic Affairs Energy Bureau. Website (Energy Regulations/Latest Regulations Announcement/Draft Regulations Announcement), the draft of the Principles for the Assessment of Landscape and Ecological Environment of Ground-based Solar Photovoltaic Facilities (Latest News and Activities/Announcement Board) is welcome to download. If you have any comments or suggestions for amendments to this draft, please provide written comments for reference between the day after this draft is published and the deadline for notification.
Spokesperson: Li Junli, Deputy Director-General of the Agency of Energy, Ministry of Economic Affairs
Contact: 02-2775-7700, 0936-250-838
Email: chunlee@moeaea.gov.tw
Business contact: Liao Shiwei, Deputy Director, Energy Administration, Ministry of Economic Affairs
Contact number: 0920-091-081
Email: swliau@moeaea.gov.tw