Technology Hardware and Equipment

Japan Great Technology Tender

📄 Tender ID: 456555827 📅 Published: 16 Sep 2020

📋 Tender Overview

This project which was funded by the Government of Japan will bring relief to residents and motorists who have been enduring the inconvenience of unbearable traffic congestion and a poor road network.These were the words of President Nana Addo Dankwa Akufo-Addo of the Republic of Ghana delivering a speech in June this year at the opening ceremony of the Tema Motorway Interchange which became the largest underpass in the country.ARAKI Yasumichi Chief Representative of JICA Ghana Office in a congratulatory speech also emphasized the importance of the underpass. We believe this high-quality road infrastructure will bring a better future for all people in the region by improving Ghanas transport sector and strengthening regional economic logistics he said.The completion of the Tema Motorway Interchange is expected to contribute to not only Ghanas economic growth but also economic development through the improvement of transport and logistics in West Africa as a whole.Alleviating heavy traffic congestion of over one kilometerThe Tema Motorway Interchange is situated at an important point where traffic from two international corridors meet one from Accra Ghanas capital city and the other from Tema the largest port city in the country. However chronic traffic congestion during morning and evening commuting hours has been a pressing issue for the government to tackle.To improve this situation the Project for Improvement of Ghanaian International Corridors was implemented and the Tema Motorway Interchange was completed after 28 months of construction work. This project realizes one of the priority projects proposed in the West Africa Growth Ring Corridor Master Plan formulated under assistance from JICA in 2018 and is expected to support the economic development of the entire West Africa region.YAMAMOTO Masashi a staff member at JICA Ghana Office said The completion of the Tema Motorway Interchange has helped to eliminate traffic congestion that sometimes exceeded one kilometer and this has delighted the people in the region. As a result goods and people can move more quickly leading to improved logistics not only in Ghana but also in West Africa as a whole.In a speech at the opening ceremony the president announced plans for road development for the area around the intersection. It is expected that the development of corridors and the revitalization of logistics across West Africa will create a positive growth cycle of investment promotion and market expansion boosting sustainable and resilient economic growth.Japanese safety education and management have resulted in more than 2.4 million accident-free man-hoursThe Tema Motorway Interchange has the longest underpass in Ghana and consist of six lanes for the main road five service roads eight ramps for right-turn traffic four pedestrian bridges with wheel chair ramps signals and street lights.In the construction a drone-based monitoring system was introduced. This system is easy to operate for local engineers with limited experience in drones and its aerial images were effectively utilized for the construction management. The contractor also adapted Japanese safety management and in their efforts to raise safety awareness among the Ghanaian and other workers led them to achieve more than 2.4 million accident-free man-hours of operation..Mr. UEMURA Yuji Project Manager of the Tema Motorway Roundabout Improvement Project SHIMIZU DAI NIPPON JV stated There were various issues leading up to the project but with the cooperation of the Government of Ghana JICA and the Ghanaian people the construction was completed safely within the planned construction period. Seeing Ghanaian people driving through the intersection with smiles on their faces is rewarding. Its a great feeling he says with a sense of accomplishment.Although the construction work progressed smoothly COVID-19 had an impact on the project near completion. In Ghana the first case of corona infection was confirmed on March 12 and the number of infected people subsequently increased. Construction personnel from Japan and other countries needed to return to their home countries.However even after the Japanese workers left the Ghanaian staff were able to continue the remaining work towards completion making full use of web-based remote assistance from Japan. The Japanese staff has successfully transferred technology and project management know-how to the Ghanaian team. The completion of the Tema Motorway Interchange could not have been done without local capacity enhanced through working with Japanese engineers.

🔍 Key Information

📄
Tender Reference No.
456555827
📅
Publication Date
16 Sep 2020
🌐
Sector
Technology Hardware and Equipment
📝
Notice Type
News
📍
Location
Japan

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 16 Sep 2020
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Japan
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…