📋 Tender Overview
Construction of the new Bergamo railway station begins today, a future hub for urban reconnection and sustainable mobility, the project of which also includes the doubling of the tracks of the Ponte San Pietro-Bergamo line.
Rete Ferroviaria Italiana, leader of the Infrastructure Hub of the FS Italiane Group and client of the work, has entrusted the management of the works to the engineering company Italferr. The interventions for the new master plan of the Bergamo station and for the infrastructural strengthening of the connection with Ponte San Pietro amount to approximately 460 million euros, partly financed also by PNRR funds. Activation is scheduled for December 2026.
Present at the start of the work were Matteo Salvini , Vice President of the Council of Ministers and Minister of Infrastructure and Transport, Claudia Terzi , Councilor for Infrastructure and Public Works of the Lombardy Region, Giorgio Gori , Mayor of the Municipality of Bergamo, Gianpiero Strisciuglio , CEO and Director General RFI and Marco Giovanni Piuri , CEO of Trenord.
In particular, the works include the construction of the new Bergamo railway station, the adaptation of the Bergamo Ospedale stop and the Ponte San Pietro station, the construction of the new Curno stop and the doubling of the tracks between Bergamo and Curno. The suppression of the 4 existing level crossings on the railway line is also envisaged, with the simultaneous construction of replacement works such as vehicular and cycle-pedestrian undercrossings.
The interventions will guarantee better mobility in the Bergamo area and an increase in the capacity of the line for the benefit of the regional connections between Bergamo, Monza and Milan and between Bergamo and Lecco as well as an increase in trips while raising the quality standards of the railway service, with particular reference to commuter traffic. The new Curno stop will allow us to expand the catchment area and guarantee greater accessibility to rail transport while the expansion of the Bergamo Ospedale stop will also allow users of the Lecco-Bergamo line to reach the health center. The interventions will also concern the Ponte San Pietro station where the adaptation of the sidewalks and the construction of a new pedestrian underpass are planned.
The new Bergamo railway station, providing larger spaces for travelers and calibrated to the future catchment area and two new pedestrian crossings of high architectural and urban quality, will become the functional fulcrum of an important organic system of transport and city mobility, both for its functions linked to rail transport and intermodal development with rail-rubber interchange, and for its role in an urban context with particular attention to environmental sustainability with new green areas and trees.
The new Bergamo station and the doubling of the Ponte San Pietro-Bergamo line are part of the broader plan of interventions to strengthen the Bergamo railway hub which also includes the creation of the new connection with the Bergamo-Orio Al Serio airport, part integral to the strategies envisaged in the industrial plan of the FS Italiane Group aimed at promoting intermodality through the rail connection of the main airports in the country.
Cantieri Parlanti – The new Bergamo railway station and the doubling of the Bergamo Ponte San Pietro line are among the strategic works of the Cantieri Parlanti project, an initiative of the FS Group (with the companies RFI and Italferr), conducted in collaboration with the Ministry of Infrastructure and Transport, the companies involved in the works and, where present, with the Extraordinary Government Commissioners.
The construction sites of the Infrastructure Hub of the FS Group "speak" a simple, transparent and immediate language, shared with the territories, to tell their story and their mission and to make citizens and stakeholders more aware and updated on the importance of the works in progress. An operation of transparency, as well as information, to illustrate the advantages of the work and provide updated data through panels located inside the construction sites, but always clearly visible to citizens and to those traveling on the lines and roads adjacent to the construction sites.
Cantieri Parlanti also communicate via a page dedicated to strategic works, present on the fsitaliane.it web portal, updated on the progress of activities. Finally, ad hoc initiatives will be organized that transform the construction sites into true communication hubs, open to the external public (citizens, associations, students, etc.) to encourage moments of discussion on the transformations that entire urban areas are experiencing and will experience thanks to the work in course.