Energy, Power and Electrical

Install Additional Charging Tender

📄 Tender ID: 533503709 📅 Published: 02 Jun 2026

📋 Tender Overview

The rest stops on the Eastern North-South Expressway from Thanh Hoa to Ca Mau have been installed by investors, planning and arranging electric vehicle charging posts. Download Rest stops on the North-South Expressway in the East are being installed by investors with charging stations. At the same time, investors also commit to continue researching and proposing plans to provide green energy (solar power station roof - battery storage system - fast charging station...) at rest stops in accordance with exploitation needs, technical infrastructure conditions and green transportation development orientation in the future. Additional charging poles on stops In the report to the Ministry of Construction Regarding the implementation of the system of electric charging stations and green fuel supply at rest stations from Thanh Hoa to Ca Mau, the Vietnam Roads Department said that on the North-South Expressway in the East from Thanh Hoa to Ca Mau, a total of 21 construction investments are invested with capital from investors, and the implementation of investment in construction of electric charging stations by investors. Vietnam Petroleum Group (Petrolimex) invested in 9 rest stations, of which Mai Son-National Highway station is being invested in. 45 (Km329+700) has completed installation and put into use 10 charging posts on each side, each charging post has 2 charging ports (equivalent to 20 parking and charging positions on each side). The remaining 8 rest stops are installing charging post systems. At each rest stop, 10 charging posts are being installed on each side, each charging post has 2 charging ports (equivalent to 20 parking spots for charging); The number of parking and charging locations is planned to be 40 on each side of the station. In addition, each side of the station has 18 locations to serve VinFast vehicles and 2 locations to serve other types of vehicles. In the coming time, we will monitor the development trend of the electric vehicle market to gradually expand the multi-standard charging system to meet the diverse needs of customers. The Futabuslines-Thanh Hiep Phat joint venture invests in 5 rest stops that currently do not have an electric charging station system installed. In the coming time, this joint venture will install an electric charging station at the National Highway 45-Nghi Son rest stop, with the expectation of installing 5 charging poles on each side of the station, each charging pole has 2 charging ports (equivalent to 10 parking positions). car to charge). In the first phase, install 2 charging posts on each side; When there is a need or when the project is completely completed, we will invest in 3 more charging posts on each side. The remaining four rest stops are expected to install 10 charging posts on each side of the station (equivalent to 20 parking spots for charging). In the first phase, 5 charging posts will be installed on each side; When there is a need or when the project is completely completed, it will invest in 5 more charging posts on each side. Xuan Khiem Group invested in 2 rest stops, including: Ham Nghi-Vung Ang (Km534+310) and Vung Ang-Bung (Km594+400). Up to now, 3 charging posts on each side have been installed (equivalent to 6 parking locations for charging). Regarding the implementation plan, Ham Nghi-Vung Ang station has completed the installation. The plan has a total of 56 parking spots on both sides of the station for charging; Currently, 12 positions have been put into operation. Vung Ang-Bung Station plans a total of 58 parking spots on both sides of the station for charging; Currently, 12 positions have been put into operation. The joint venture T&T-19/5-Trung Phuong-Dong Bac invests in the Cam Lo-La Son rest stop (Km36+500), which currently does not have a charging station system installed. It is expected to install 5 charging posts on each side of the station (equivalent to 10 parking locations for charging). In the first phase, install 2 charging posts on each side; When there is a need or when the project is completed synchronously, we will invest in 3 more charging stations on each side.RELATED NEWSProposed model of socialization of investment in charging station networkPromoting the development of electric vehicle charging station infrastructure in apartment buildingsVietnam has issued 28 national standards on electric charging stations and stations.Minh Dang General Investment Joint Stock Company invests in Quy Nhon-Chi Thanh rest stop (Km1251+500) which has not yet installed the system. charging station system. In the future, at each rest stop, 10 charging poles are being installed on each side (equivalent to 20 parking and charging locations); The number of parking and charging locations is planned to be 40 on each side of the station. Chau Thanh TTC Company invested in the Vinh Hao-Phan Thiet rest stop (Km205) and has installed and put into operation a station on the right side of the route with 7 charging posts (equivalent to 14 parking and charging locations); The station on the left side of the route has 6 charging posts (equivalent to 12 parking lots for charging). In the future, each rest stop will install 10 charging posts on each side (equivalent to 20 parking spots for charging); The number of parking and charging locations is planned to be 40 on each side of the station. Investor Joint Venture INDEL Investment and Development Joint Stock Company - Limited Liability Company A member of Binh An Petroleum invests in the Can Tho-Hau Giang rest stop (Km45+00), which currently does not have a charging station system installed. It is expected to install 10 charging poles on each side of the station (equivalent to 20 parking locations for charging). Investor Company Thi Son Production and Construction Limited Company invests in Hau Giang-Ca Mau rest stop (Km100+200), which has not yet installed a charging station system. It is expected to install 06 charging posts on each side of the station (equivalent to 12 p

🔍 Key Information

📄
Tender Reference No.
533503709
📅
Publication Date
02 Jun 2026
🌐
Sector
Energy, Power and Electrical
📝
Notice Type
News
📍
Location
Viet nam

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 08 Jun 2026
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Viet nam
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…