Roads and Highways

India Network Planning Tender

📄 Tender ID: 491035900 📅 Published: 10 Jul 2023

📋 Tender Overview

During the milestone 51st meeting of the Network Planning Group under PM GatiShakti chaired by Shri Rajesh Kumar Singh Secretary Department for Promotion of Industry and Internal Trade DPIIT Ministry of Commerce and Industry along with Smt. Sumita Dawra Special Secretary Logistics DPIIT five projects of Ministry of Road Transport and Highways MoRTH worth Rs. 15683 cr. were evaluated.These five projects in States of Mizoram 1 Maharashtra 2 Uttarakhand 1 and Kanpur 1 are expected to improve connectivity to industrial clusters and social sector assets and improve logistics efficiency through streamlining freight traffic movement and decongestion of cities.Critical from the perspective of regional connectivity the Greenfield Twin Tube Uni-directional Aizawl Bypass Tunnel of 2.5 km proposed under Bharatmala Pariyojna-2 will enhance connectivity between Sittwe port on Kaladan river in Myanmar and North East Region. It will also provide connectivity to economic centres in Sairang Aizawl Seling social sector assets including Zoram Medical College Mizoram Central University and NIT Aizawl and tourist places including Solomons Temple Church Aizawl Mizoram State Museum Aizawl. This project is expected to reduce time taken and bring in efficiency due to an increase in average speed by 50. Through this tunnel travel distance and time between Phaibawk and Sairang is expected to reduce by 39 and 60 respectively.Two capacity augmentation projects in State of Maharashtra important from the perspective of connectivity to economic centres religious and tourist places industrial clusters and defence assets were evaluated. Both projects- Nashik Phata to Khed alignment and Sant Dnyaneshwar Maharaj Palkhi Marg planned using NMP Portal with focus on key principles of PM GatiShakti National Master Plan are envisaged to improve connectivity to 10 Economic Nodes and 12 Social Nodes enhanced multi-modality with integrated infrastructure development and improved utility network. Land acquisition and other clearances are being optimised through identification of clearance approval requirements on NMP Portal.The proposed project on construction for mitigation measures of 20 nos. landslides 11 nos. sinking zones and 2 nos. of bridges in the State of Uttarakhand will ensure all year-round connectivity between various parts of Garhwal region of Uttarakhand industrial locations such as Karnprayag and Gaucher helipads located at Gaucher and are critical from disaster management perspective.Greenfield project of construction of 6-lanning bypassring roads around Kanpur city under Bharatmala is likely to reduce travel distance and time and fuel consumption. The project will be useful for decongestion of Kanpur City and provide direct connectivity between Lucknow Kanpur Expressway NH-19 and further towards Chakeri Airport.Discussion on the Ministry of Steel MoS proposal to include slurry pipeline projects within GatiShakti framework and Network Planning Group evaluation process was also held.NPG members from Mo Road Transport and Highways Mo Railways Mo Ports Shipping and Waterways Mo Civil Aviation Mo Power Mo Petroleum and Natural Gas Department of Telecommunication DoT Mo New and Renewable Energy and NITI Aayog participated in the 51st NPG meeting along with representatives from concerned States.Launched on October 13th 2021 the PM GatiShakti National Master Plan NMP adopts a whole of government approach to infrastructure planning and implementation. Two key elements for operationalizing the PM GatiShakti PMGS include i GIS data based digital platform and ii institutional framework.The PM GatiShakti National Master Plan NMP has been developed on a dynamic Geographic Information System GIS platform wherein data on economic and social infrastructure trunk and utility network multimodal connectivity tourist spots land revenue maps forest boundaries etc. needed for project planning and implementation have been mapped on the NMP. The NMP has been further developed as a data-based decision support system with project planning tools dynamic dashboards MIS report generation etc. to support line MinistriesDepts and StatesUTs in infrastructure planning and implementation.So far 39 line MinistriesDepartments including 8 infrastructure 13 economic and 18 social sector MinistriesDepartments and 36 StatesUTs have been onboarded on PM GatiShakti NMP.The institutional framework comprising of an Empowered Group of Secretaries EGoS a Network Planning Group NPG and a Technical Support Unit TSU is fully functional at the Central level. As per the approved CCEA note the Logistics Division operationalized the NPG and has been acting as Secretariat to the EGoS since November 2021. A similar institutional framework required to be set up in each StateUT has been completed and is fully operational.During the NPG meetings held every fortnight under the chairpersonship of Special Secretary Logistics DPIIT project proposals of different MinistriesDepts are evaluated PM GatiShakti principles including intersection with assets of other Ministries forestwildlife date layers suitability of alignment to minimize dislocation of habitation utilisation of existing government land to the extent possible comprehensive socio-economic development of the influence area etc. The aim is to minimize disruption explore complementarities promote optimized and holistic planning for multimodal connectivity and improve last mile connectivity and logistics efficiency.

🔍 Key Information

📄
Tender Reference No.
491035900
📅
Publication Date
10 Jul 2023
🌐
Sector
Roads and Highways
📝
Notice Type
News
📍
Location
India

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 10 Jul 2023
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country India
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…