📋 Tender Overview
Atal Mission for Rejuvenation and Urban Transformation AMRUT was launched on 25 June 2015 in 500 selected cities across the country. The Mission focuses on the development of basic urban infrastructure in the sectors of water supply sewerage and septage management storm water drainage non-motorised urban transport and development of green spaces and parks. Mission also mandates a set of 11 Reforms for all the Mission cities and Capacity Building activities for the Urban Local Bodies ULBs.Following are the achievements of AMRUT schemeProjects amounting to 78910 crores have been grounded.Work worth 47703 crores have been carried out including completed projects worth 16449 crores.97 lakh water tap connection and 62 lakh sewer household connections have been provided under AMRUT and in convergence with other scheme.Sewer Treatment Plants STPs of capacity 1090 MLD Million Litre per Day have been developed against the target of 6000 MLD.1563 Water logging points eliminated against target of 2804 points.3500 acre of green permeable spaces parks developed.80 lakh street lights replaced with energy efficient LED lights saving 176 kilo watt per hour power and reducing carbon emission by 14.07 lakh tonnes per annum.Online Building Permission System OBPS adopted in 2205 towns including 444 AMRUT towns. Under Green Spaces and Parks sector States have taken up 2538 projects worth 1577.83 crores of which 1776 projects worth 1000.96 crores have been completed. This has led to development of 3500 acre of permeable green spaces against the proposed development of 5400 acre of green spaces and parks under AMRUT.Under AMRUT work of selection appraisal approval and implementation of projects in cities have been delegated to StatesUTs and concerned ULBs. At Central level only State Annual Action Plans SAAPs submitted by the States are considered for approval. AMRUT makes States equal partners in planning and implementation of projects thus actualizing the spirit of cooperative federalism. Random citizen survey and feedback about the services is an integral part of the Mission.AMRUT being a Centrally Sponsored Scheme is funded through Central and StateULB share. The total Central outlay for AMRUT scheme is 50000 crores of which 36036 crores have been earmarked for Central Assistance for AMRUT projects and remaining have been earmarked for Administrative and Office Expenses AOE and Reform Incentives. States have taken up AMRUT projects worth 81226 crores. Therefore requirement of funds over and above the committed Central Assistance are borne by States themselves.