📋 Tender Overview
On the morning of December 15, Deputy Prime Minister Tran Hong Ha chaired a meeting to listen to reports on the preparations to organize the inauguration ceremony and start of large-scale and meaningful projects and works on December 19 - National Resistance Day, to celebrate the 14th National Congress of the Party. Deputy Prime Minister Tran Hong Ha chaired a meeting to listen to reports on the preparations to organize inauguration ceremonies and start construction of large-scale and meaningful projects and works on December 19 - Photo: VGP/Minh Khoi. The Deputy Prime Minister emphasized the need to carefully review the list and the proportion of works and projects started and inaugurated to be compiled, including the number of works and projects of the private enterprise sector, ensuring representation, symbolism and real meaning. The Ministry of Construction, ministries, branches and localities must be responsible for ensuring that projects fully meet the conditions and criteria, avoiding problems arising after the inauguration ceremony. The content of emulation and rewards should be associated with the summary of 5 years of socio-economic infrastructure development. Accordingly, projects that have been inaugurated and started construction must be proportionately reflected in the emulation and reward work, ensuring the right people, the right organization, the right criteria, and at the same time fairness and harmony between sectors, between the public and private sectors, and between localities. Plans for organizing live and online videoconferences must ensure focus, formality and efficiency, and clearly select a central bridge point. According to a report from the Ministry of Construction, to date On December 14, the Ministry compiled 237 projects and works of ministries, branches, localities, groups, and corporations in 34 provinces/cities that are eligible to start construction and inaugurate. Of which, 151 projects and works started; Inauguration and technical opening of 86 projects and works. Total investment of projects and works is over 3.4 million billion VND (state capital is more than 627 trillion VND, other capital sources are more than 2.79 million billion VND). The Ministry of Construction proposed the organization of 79 bridge points (corresponding to the 79th anniversary of the National Resistance Day) including: 1 central bridge point, 11 direct bridge points, 67 online bridge points. Regarding emulation and reward work, Deputy Minister of Home Affairs Cao Huy said that the Ministry of Home Affairs has closely coordinated with the Ministry of Construction, issuing specific instructions to ministries, branches and localities to propose and synthesize 59 cases of commendation, including 28 collectives and 31 individuals to award Labor Medals of all grades and 48 Certificates of Merit from the Prime Minister. The Deputy Prime Minister noted that emulation and reward work must be harmonious, structured, balanced, closely reflecting reality and showing the spirit of development. Declaring projects. Rewards must be given to the right person, the right job, and linked to the work, project, and actual results; ensure the representativeness, harmony, and spread of the results of 5 years of task implementation; fully reflects people and organizations; Central and local; domestically and abroad; state-owned enterprises and private enterprises; local Party, State and Front agencies. The commendation at the ceremony needs to have an appropriate form and duration to reflect the major emulation movement in 5 years, ensuring a sense of encouragement, avoiding formality and causing counter-effects. The Ministry of Home Affairs is responsible for guiding, coordinating and directing to ensure emulation and rewards that are objective, fair, representative and meaningful to motivate the movement; If found inappropriate, we must continue to review and propose adjustments. The Ministry of Construction is also urgently completing the Central Report of the Prime Ministers speech, summarizing the 5-year journey, 2021-2025, to implement a breakthrough in the synchronous and modern infrastructure development strategy according to the Resolution of the 13th Party Congress, affirming the socio-economic achievements that have been achieved and creating new momentum and motivation for the next stage of development. At the meeting, City representative. Hanoi, Ho Chi Minh City, Dong Nai province and Airports Corporation of Vietnam (ACV) reported specifically on the conditions, progress and preparation work at construction works and projects in the area, focusing on meeting the criteria for inauguration, construction start, organizational plan, safety and technical assurance. Representatives of Vietnam Television reported in detail the overall scenario plan, signal connection methods, ensuring technical infrastructure, transmission and broadcasting, serving the organization of the ceremony at the central bridge point as well as the direct bridge points, ensuring smoothness, synchronization and safety. The Deputy Prime Minister requested Vietnam Television to preside over the development and completion of scripts and plans for organizing the central bridge point and at the direct bridge points in a clear and feasible direction, closely following the central report and the Prime Ministers speech, minimizing editing to avoid complications in the organization. Artistic content at the bridge points needs to be selected. Choose appropriately, create a common atmosphere but have an identity, avoid formality. Military Industry and Telecommunications Group (Viettel), Vietnam Posts and Telecommunications Group (VNPT) and related units closely coordinate with Vietnam Television, ensuring smooth technical infrastructure and transmission lines, without incidents occurring during the organization.program. The Deputy Prime Minister agreed on a plan to organize 79 bridge points corresponding to the 79th anniversary of