📋 Tender Overview
President of the Republic of Azerbaijan Ilham Aliyev has today left the foundation of the Khankendi Railway and bus station complex.
Digital Development and Transport Minister Rovshad Nabiyev and Chairman of the Azerbaijan Railways Rovshan Rustamov informed the head of state and informed the head of state and Aghdam-Khankendi railway project.
It was noted that the continued Agdam-Khankendi railway line which is a continuation of the Barda-Aghdam railway is 28 kilometers 34.7 kilometers. Aghdam-Khankendi railway line including 4 bridges 5 rollovers 3 pedestrian crossing 2 catering pipes design work is completed. During this railway line 3 stations - Askeran and Khojaly stations Khankendi railway and bus station engineers bridges passports cars pedestrians and other necessary infrastructure and other necessary infrastructure. The project will cover 2025-2026.
It was noted that the design of the Khankendi railway and bus station complex has already begun. The field of complex will be 6.4 hectares. The five-storey complex is planned to build two railway platforms and 12 bus stops. The complex will consist of waiting hall ticket office medical center parent and childrens rooms shops restaurants administrative and meeting rooms childrens entertainment center outdoor terrace and recreation areas. The railway section of the complex will serve the passengers of 800-1000 per day while the bus station will serve 1000-1200 passengers.
It should be noted that Aghdam-Khankendi railway was built in 1979 under the initiative and management of national leader Heydar Aliyev. The great leader who always pays great attention to the development of Karabakh attached special importance to the construction of railway lines into this region. As a result of the opening of the Baku-Yevlakh-Khankendi railway the socio-economic and cultural development of Karabakh has accelerated.
Pictures of large size