📋 Tender Overview
Basic School No. 259 Prof. The intervention, promoted by the Ministry of Public Works and Communications (MOPC), in conjunction with the Ministry of Education and Sciences (MEC), and executed by Constructora Ritter, covers the reform, expansion and adaptation of the infrastructure on a property of more than 23,000 square meters, respecting the historical characteristics of the establishment. Conservation with an eye to the future This project was conceived under heritage conservation criteria, based on a technical survey that allowed the identification of the historical and architectural elements that should be preserved. In this regard, the architect who specializes in the conservation and restoration of heritage assets of the contracting company, Jose Maria Calvo, expressed: The school is part of the collective memory of the community. Its conservation implies preserving not only an educational infrastructure, but also a space of identity and belonging for Piribebuy. The proposal preserves the buildings in good condition, recovers historical sectors and adapts existing spaces to current needs. In addition, it incorporates new infrastructures that are integrated into the original complex, respecting the historical configuration of the school. The challenge of the work is to balance the preservation of heritage values with the contemporary needs of security, accessibility and functionality that a modern educational institution requires. More spaces for the educational community The work includes the construction of new blocks for the initial level, classrooms for secondary education, workshops, inclusive toilets, support areas, a school cafeteria and a sports center with bleachers and a multipurpose field. It also includes an athletics track, recreational spaces and electrical, sanitary and fire prevention systems, in accordance with current regulations. During execution, special measures are implemented to protect heritage sectors, through permanent technical controls and specialized supervision. The undertaking --financed by the Itaipu Paraguay Technology Park Foundation (FPTI-PY)--, which to date has registered a progress of 28%, includes the preparation of the Executive Project and the execution of the civil works of Lot 06, with an investment of G. 14,856,341,513. All this with the supervision of RVV Engineering and under the supervision of the MOPC. Date: July 8, 2026