📋 Tender Overview
The transformative project, which includes nearly a thousand square meters of new asphalt and more than 1,500 meters of sidewalks, continues its execution with municipal machinery and personnel in the area.The works do not stop in San Juan de Lurigancho. In the Heroes de la Brena sector, in Campoy, the renovation work on tracks and sidewalks is advancing at a steady pace, complying with the schedule established by the municipal management to comprehensively transform this area of the district.
In these first days of intervention, municipal staff proceeded to completely remove all the old and deteriorated infrastructure that occupied the public space. This action has made it possible to clear the land and prepare optimal conditions for the construction of new structures that will benefit hundreds of families.
Formwork has already begun for the new sidewalks, curbs and stairs, which will restore safety and accessibility to pedestrians. This process is key to guarantee the quality and durability of each built element, designed to withstand the passage of time and the daily use of the community.
The project in Heroes de la Brena is large-scale. It includes nearly one thousand square meters of new asphalt, more than 600 square meters of cobblestone pavement and almost 1,500 square meters of sidewalks and access ramps. In addition, it includes stairs, protective railings, new green areas, banked curbs and modern signage. An investment of more than a million and a half soles that demonstrates, once again, that this management delivers and changes lives with concrete actions.