π Tender Overview
The Regional Government of Arequipa moves a modular steel Harson-type bridge to the district of Choco, province of Castilla, with the aim of restoring and guaranteeing safe traffic in the area.
The metal structure has a length of 51.32 meters and a load capacity of up to 48 tons. It will be installed by the Regional Transportation and Communications Management, in coordination with PROVIAS, as part of the actions aimed at strengthening road connectivity for the benefit of the population.
This will be the second modular bridge that the Regional Government installs in the province of Castilla; The first was placed in the district of Chachas, allowing connectivity to be recovered in that jurisdiction.
The bridge will arrive in the Choco district on February 19, the date on which preparatory work will begin for its subsequent assembly and installation. This intervention will improve the movement of people and the transportation of products, strengthening territorial integration and boosting economic activity in the province.